Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Athelknight ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

30/12/1929 ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

394 ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

undefined ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

27/06/1942 ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Physical arrangement of a ship’s masts, sails and rigging.

The year in which a vessel’s construction is completed.

Year of ship completion

1930 ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Robert Duncan & Co Ltd ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Twin Screw Motor Vessel ( Request for Special Survey for Athelknight, 11th March 1929 1929, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942 )

undefined ( Certificate of Survey for Athelknight, 31st December 1929 1929, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943 )

Screw Motor Vessel ( Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930 )

Tanker ( Profile & Deck Plan for Athelknight, 6th March 1930 1930, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron & Steel ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

A vessel’s calculated maximum speed.

Speed (knots)

h 1929 ( Request for Special Survey for Athelknight, 11th March 1929 1929 )

1929 ( Certificate of Survey for Athelknight, 31st December 1929 1929 )

1930 ( Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930 )

1942 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942 )

1943 ( Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943 )

ndated ( Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929, Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943, Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Draft

1929 ( Request for Special Survey for Athelknight, 11th March 1929 1929, Certificate of Survey for Athelknight, 31st December 1929 1929 )

1930 ( Memo for the Chief Ship Surveyor with their annotations regarding First Entry for Athelknight, 13th March 1930 1930, Steel Motorship Report for Athelknight, 8th March 1930 1930, Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930, Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930, Certificate of Survey for Athelknight, 26th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Boilers for Athelknight, 15th February 1930 1930, Report on Electric Fittings for Athelknight, 6th March 1930 1930, Profile & Deck Plan for Athelknight, 6th March 1930 1930, Half Midship Section Plan for Athelknight, 6th March 1930 1930 )

1942 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelknight, 20th May 1942 1942, Letter from the Clerk to the Classification Committee to the Barry Surveyors regarding fee for Continuous Survey of oil engines for Athelknight, 12th May 1942 1942, Letter from Hamish McG Paton, for the Barry Surveyors, to the Secretary for Lloyd\'s Register regarding fee for Continuous Survey of Athelknight, 8th May 1942 1942, Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942, Certificate of Survey of Donkey Boilers & Part Machinery for Athelknight, 7th May 1942 1942 )

1943 ( Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943 )

0000 ( Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 3,30; Carrying Molasses Petroleum in Bulk; Lloyd\'s A & CP; +LMC 3,30; 2 DB 180 Ib; Longitudinal Framing ( Steel Motorship Report for Athelknight, 8th March 1930 1930 )

+LMC 3,30; 2 DB 180lb ( Report on Oil Engine Machinery for Athelknight, 15th February 1930 1930 )

See Accompanying Report ( Report on Boilers for Athelknight, 15th February 1930 1930 )

See Accompanying Machinery Report ( Report on Boilers for Athelknight, 15th February 1930 1930 )

Elec Light ( Report on Electric Fittings for Athelknight, 6th March 1930 1930 )

+100A1; Examined 5,42; D B S 5,42 ( Report of Survey for Repairs, &c for Athelknight, 5th May 1942 1942 )

D B S 5,42 ( Report of Survey for Repairs, &c, of Engines & Boilers for Athelknight, 6th May 1943 1943 )

+100A1 5,42; Examined 5,42; SS No 2,38; +LMC 312,38; 9,40; DBS 5,42; CBS 9,4; TS 8,40 CL; Carrying Molasses or Petroleum in Bulk; Oil Engines ( Report of Total Loss, Casualty, &c for Athelknight, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Direct Acting Internal Combustion ( Form for Vessels of 100 Tons & Upwards for Athelknight, 27th February 1930 1930 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.