Name of ship as recorded on the record
Fultala ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
06/08/1940 ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
664 ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Location where a vessel’s survey was undertaken.
Wokingham ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940 )
Annan, Scotland ( Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939 )
Stockton on Tees ( Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939 )
Sunderland ( Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940 )
Glasgow ( Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940 )
London ( Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940 )
Middlesbrough ( Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940 )
Stockton on Tees; Middlesbrough ( Report on Boilers for Fultala, 2nd October 1940 1940 )
Annan; Glasgow ( Report on Boilers for Fultala, 4th April 1940 1940 )
Glasgow; Stockton On Tees ( Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940 )
Calcutta ( Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942 )
A vessel’s means of propulsion.
Motor (internal combustion) ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Boiler for Fultala, 1st November 1939 1939, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
undefined ( Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940 )
Steam ( Report on Oil Engine Machinery for Fultala, 24th October 1940 1940 )
Is the steamer assisted by sail?
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk Owing to War Causes ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Recorded date for the vessel’s loss or disposal.
13/04/1942 ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
The port in which a vessel is registered or permanently based.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; With Freeboard; Lloyd's A & CP; +LMC 10,40; 2 DB-120lb; Oil Eng CL ( Steel Motorship Report for Fultala, 30th October 1940 1940 )
+LMC 10,40; Oil Eng; 2DB 120B CL ( Report on Oil Engine Machinery for Fultala, 24th October 1940 1940 )
See Sld FE 32996 ( Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940 )
+100A1 with freeboard 11,41; +LMC 6,40; CL ( Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942 )
+100A1 with Fbd 11,41; +LMC 10,40CL; Oil Engine ( Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
GMSJ ( Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940 )
Type and configuration of the engine(s) supplied for a vessel.
Internal Combustion Opposed Piston Type Vertical ( Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940 )
Oil Engines 2 SCSA ( Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940 )
Opposed piston airless injection ( Report on Oil Engine Machinery for Fultala, 24th October 1940 1940 )
Date in which construction of a vessel’s engines were completed.
1940 ( Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942 )
The year in which a vessel’s construction is completed.
1940 ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Doxford & Sons Ltd ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Cargo ( Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
The official record pronounced by the Committee
Sunk (war loss) ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Indian Ocean ( Letter from Clerk to the Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding the installation of the boiler & the classification of Fultala, 19th November 1940 1921, Plan of Detail of Composite Boiler for Fultala, 26th October 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Plan of Boiler for Fultala, 1st November 1939 1939, Profile & Deck Plan for Fultala, 28th September 1939 1939, Half Midship Section Plan for Fultala, 28th September 1939 1939, Receipt for Steel Boiler Plates for Fultala, 4th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 7th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 13th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 6th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 5th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 9th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 20th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 19th October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 23rd October 1939 1939, Receipt for Steel Boiler Plates for Fultala, 28th October 1939 1939, Memo regarding Enclosure of Cochran Boiler for Fultala, 29th November 1939 1939, Boiler Endorsement for Fultala, 28th November 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the boiler plan proposed for Fultala, 24th November 1939 1939, Memo regarding Enclosure for Fultala, 28th November 1939 1939, Boiler Endorsement for Fultala, 23rd November 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, submitting for approval an amended boiler plan proposed for Fultala, 21st November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler for Fultala, 16th November 1939 1939, Boiler Endorsement for Fultala, 10th November 1939 1939, Letter from S Wood, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, London, submitting for approval the plan for the boiler proposed for Fultala, 4th November 1939 1939, Letter from Secretary, Lloyd's Register, London to The Secretary, Lloyd's Register, Glasgow, regarding the approval of the air receiver plan proposed for Fultala, 28th September 1939 1939, Air Receiver Endorsement for Fultala, 27th September 1939 1939, Letter from Secretary, to the Glasgow Committee, Lloyd's Register, to The Secretary, Lloyd's Register, London, submitting for approval the air storage tank plans proposed for Fultala, 25th September 1939 1939, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the plan of the air storage tanks proposed for Fultala, 25th September 1939 1939, Letter from Secretary, Lloyd's Register, London to the The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the crankshaft plans proposed for Fultala, 27th June 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 27th May 1939 1939, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Middlesbrough, regarding the approval of the boiler plan proposed for Fultala, 26th May 1939 1939, Memo regarding the approval of the boiler plan for Fultala, 26th May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Lloyd's Register, Secretary, London, submitting for approval the boiler plan proposed for Fultala, 23rd May 1939 1939, Letter from R J Easthope, per The Surveyors, Lloyd's Register, Middlesbrough to The Secretary, Lloyd's Register, London, regarding the boiler plan for Fultala, 8th October 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Fultala, 19th November 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, Wokingham, regarding measurements being different to the sister ship of Fultala, 12th November 1940 1940, Remarks of the Chief Ship Surveyor to The Classing Committee regarding errors made in reporting the breadth of the bracket floors of Fultala, 7th November 1940 1940, Extract from Freeboard Verification of Marking form for Fultala, 19th November 1940 1940, Letter from Clerk to The Classification Committee, Lloyd's Register, Wokingham to The Secretary, Lloyd's Register, Glasgow, regarding a difference of measurements with the sister ship of Fultala, 14th November 1940 1940, Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding engine & machinery of Fultala, 7th November 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Profile & Deck Plan for Fultala, 30th October 1940 1940, Half Midship Section Plan for Fultala, 30th October 1940 1940, Receipt for Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 30th March 1940 1940, Advice Note from The Steel Co of Scotland Ltd to Stockton Chemical Engineers & Riley Boilers Ltd regarding Boiler Bars for Fultala, 27th April 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 27th April 1940 1940, Receipt for Steel Boiler Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 24th January 1940 1940, Receipt for Boiler Steel Plates Manufactured by The Steel Co of Scotland Ltd for Fultala, 9th March 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940, Letter from Secretary, Lloyd's Register, London to the Surveyors, Lloyd's Register, Sunderland, regarding the approval of the bilge & ballast arrangement plan & the noting of the fire extinguishing arrangement for Fultala, 19th August 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement & the fire extinguishing arrangement for Fultala, 15th August 1940 1940, Copy of a Correspondence to The Surveyors, Sunderland, regarding Fultala, 7th June 1940 1940, Pumping Arrangement Endorsement for Fultala, 6th June 1940 1940, Letter from L R Horne, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the bilge & ballast arrangement for Fultala, 4th June 1940 1940, Memo regarding Enclosure of General Pumping Arrangement for Fultala, 18th March 1940 1940, Pumping Arrangement Endorsement for Fultala, 14th March 1940 1940, Letter from C A Millar, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the suction pipe arrangements for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, regarding the main switchboard for Fultala, 11th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 10th July 1940 1940, Memo regarding Electrical Equipment for Fultala, 9th July 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three plans for the electrical equipment proposed for Fultala, 6th July 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 18th June 1940 1940, Memo regarding Electrical Equipment for Fultala, 17th June 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval a plan of the main switchboard proposed for Fultala, 15th June 1940 1940, Copy of a Correspondence to Sunderland, regarding Fultala, 13th March 1940 1940, Memo regarding Electrical Equipment for Fultala, 13th March 1940 1940, Letter from G Auterson, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval three electrical equipment plans proposed for Fultala, 6th March 1940 1940, Letter from W H Andrews, pro Secretary to the Glasgow Committe, Lloyd's Register to The Secretary, Lloyd's Register, London, regarding the enclosed drawing of an end pad for Fultala, 12th June 1940 1940, Memo regarding Enclosure of Plan of Riveted Air Receivers for Fultala, 21st May 1940 1940, Air Receiver Endorsement for Fultala, 21st May 1940 1940, Letter from L C Davis, Surveyor, Lloyd's Register, Glasgow to The Secretary, Lloyd's Register, Glasgow, submitting for approval the air vessels plan proposed for Fultala, 18th May 1940 1940, Letter from Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, Sunderland, regarding the approval of the boiler & oil fuel burning arrangement plans proposed for Fultala, 1st June 1940 1940, Memo submitting the boiler oil, clean oil & fuel supply tanks for Fultala, 31st May 1940 1940, Pumping Arrangement Endorsement for Fultala, 31st May 1940 1940, Letter from W H Fraser, per The Surveyors, Lloyd's Register, Sunderland to The Secretary, Lloyd's Register, London, submitting for approval the oil fuel tank & oil fuel arrangements plans proposed for Fultala, 28th May 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Motorship Report for Fultala, 30th October 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940 )
Mdb ( Report on Boilers for Fultala, 2nd October 1940 1940 )
Gls ( Report on Boilers for Fultala, 4th April 1940 1940 )
Cal ( Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942 )
The individual and/or organisation listed
British India Steam Navigation Co Ltd ( Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
British India Steam Navigation Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5051 ( Steel Motorship Report for Fultala, 30th October 1940 1940, Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report on Boilers for Fultala, 4th April 1940 1940, Report on Electrical Equipment for Fultala, 25th October 1940 1940, Certificate of Survey of Boiler & Machinery for Fultala, 26th March 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942, Report of Total Loss, Casualty, &c for Fultala, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
William Crawford Currie ( Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940 )
Location of construction for a vessel’s engines.
Sunderland ( Form for Vessels of 100 Tons & Upwards for Fultala, 22nd October 1940 1940, Report on Oil Engine Machinery for Fultala, 24th October 1940 1940, Report on Boilers for Fultala, 2nd October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Fultala, 26th March 1942 1942 )
Stockton ( Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Engine or Boiler Valves or Connections Form for Fultala, 19th June 1940 1940 )
Stockton on Tees ( Engine or Boiler Valves or Connections Form for Fultala, 1940 1940, Boiler Valves & Connections Form for Fultala, 1940 1940 )
The listed port to which a given vessel belongs.