Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/10/1940
The year in which a vessel’s construction is completed.
1940
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Doxford & Sons Ltd
Unique identifier for a given ship, it is assigned by a builder.
664
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
1 Steel Steamer or Motorship
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
26/10/1940
Name of the individual/entity/organisation responsible for authoring the record
C A Millor
Location where a vessel’s survey was undertaken.
Sunderland
Date of the meeting of the Classing Committee.
19/11/1940
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk (war loss)
Vessel’s area of loss or disposal/last known recorded location.
Indian Ocean
Physical extent of a record.
2
Name of ship as recorded on the record
Fultala
The process of transferring a vessel to water, but not necessarily her completion.
06/08/1940
Name of the shipbuilder as it appears on the record.
J Ramsay Gebbie
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
32996
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
03/01/1940
The individual and/or organisation listed
British India Steam Navigation Co Ltd
Location where the document is written.
Sunderland
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; With Freeboard; Lloyd's A & CP; +LMC 10,40; 2 DB-120lb; Oil Eng CL
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5051
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk Owing to War Causes
Recorded date for the vessel’s loss or disposal.
13/04/1942
Pertinent, useful or interesting recorded content.
Title of Document has been Altered; Also refers to vessel Derwenthall
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.