Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Morpeth ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902 )
Meldon ( Plan of Steam Boiler for Meldon, 21st March 1902 1902 )
Dimitrios ( Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The process of transferring a vessel to water, but not necessarily her completion.
04/09/1902 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Unique identifier for a given ship, it is assigned by a builder.
72 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902 )
+100A1 Steel; Lloyds A & CP; +LMC 10,02 ( Steel Steamer Report for Morpeth, 25th October 1902 1902 )
+LMC 10,02 ( Report on Machinery for Morpeth, 11th October 1902 1902 )
Deferred for No 3 &c ( Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
A vessel’s means of propulsion.
Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Is the steamer assisted by sail?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Is machinery fitted at the aft of the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Steamer Report for Morpeth, 25th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902 )
Sws ( Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The individual and/or organisation listed
The Morpeth Steam Ship Co Ltd ( Steel Steamer Report for Morpeth, 25th October 1902 1902 )
Morpeth Steam Ship Co Ltd ( Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902 )
J C Adam ( Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902 )
Daniolos Bros ( Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
E C Embiricos ( Form of Postponed Surveys for Dimitrios, 4th August 1915 1915 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Cowie ( Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902 )
W Cowie ( Report on Machinery for Morpeth, 11th October 1902 1902 )
S Daniolos ( Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The name of the port/place of destination given.
Genoa ( Steel Steamer Report for Morpeth, 25th October 1902 1902 )
Bristol Channel ( Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915 )
Bristol Channel; Swansea ( Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2508 ( Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound Direct Acting Inverted Vertical Surface Condensing ( Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902 )
Triple Expansion ( Report on Machinery for Morpeth, 11th October 1902 1902 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1902 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Stephenson & Co Ltd ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The port or place in which the vessel’s construction took place, at the time of writing.
Hebburn on Tyne ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Screw Steamer ( Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Does the vessel possess an auxiliary power source?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Is electric lighting fitted to the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding classification for Morpeth, 27th October 1902 1902, Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902, Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902, Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902, Plan of Steam Boiler for Meldon, 21st March 1902 1902, Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from J E Roberts, Alexandria Surveyor, to the Secretary of Lloyd's Register, London, regarding Special Survey No 3 to be held on return in about two months for Dimitrios, 9th October 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Location where a vessel’s survey was undertaken.
Newcastle upon Tyne ( Letter from J Hall, Superintendent of Morpeth Steamship Co Ltd, Owners, to Newcastle Surveyors regarding ceiling of Tank tops be laid only in way of Hatchways & side limbers for Morpeth, 24th October 1902 1902 )
Newcastle ( Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902, Report on Machinery for Morpeth, 11th October 1902 1902, Report on Electric Lighting Installation for Morpeth, 11th October 1902 1902 )
Hebburn on Tyne ( Half Midship Section Plan for Morpeth, 20th February 1902 1902, Profile Plan for Morpeth, 10th February 1902 1902 )
Wallsend ( Plan of Steam Boiler for Meldon, 21st March 1902 1902 )
London ( Letter from C L Embiricos to the Secretary of Lloyd's Register acknowledging receipt of letter to be sent to Owners for Dimitrios, 23rd December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postponement of Special Survey No 3 for Dimitrios, 22nd December 1914 1914, Letter from C L Embiricos to Lloyd's Register, London, regarding Owners requesting extension of another year on survey for Dimitrios, 18th December 1914 1914, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to postpone boiler survey for three months for Dimitrios, 4th August 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd\'s Register regarding telegram from Owners requesting postponement of survey for three months for Dimitrios, 3rd August 1915 1915, Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915, Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915, Letter from Assistant to the Secretary of Lloyd's Register, London to C L Embiricos Esq requesting proposed arrangements for overdue Special Annual Survey of boilers for Dimitrios, 7th July 1915 1915 )
Swansea ( Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The listed port to which a given vessel belongs.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
J C Adam ( Steel Steamer Report for Morpeth, 25th October 1902 1902, Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902 )
Daniolos Bros ( Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Recorded information related to a vessel’s movements.
Newcastle on Tyne; Genoa ( Steel Steamer Report for Morpeth, 25th October 1902 1902 )
Algiers to Bristol Channel ( Letter from the Secretary of Lloyd's Register, London, to Swansea Surveyors regarding Agent for Owners informing vessel loading for Bristol Channel & boiler survey to be carried out for Dimitrios, 14th July 1915 1915, Letter from the Secretary of Lloyd's Register, London, to C L Embiricos Esq informing that Committee agreeable to boiler survey being carried out upon arrival in Bristol Channel for Dimitrios, 13th July 1915 1915 )
Bagnoli to Algiers to load ore for Bristol Channel ( Letter from C L Embiricos to the Secretary of Lloyd's Register regarding communicating with Captain at port of discharge in respect of survey for Dimitrios, 8th July 1915 1915 )
Physical arrangement of a ship’s masts, sails and rigging.
The port in which a vessel is registered or permanently based.
Newcastle ( Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902 )
Andros ( Form of Postponed Surveys for Dimitrios, 21st December 1914 1914, Form of Postponed Surveys for Dimitrios, 4th August 1915 1915, Form of Postponed Surveys for Dimitrios, 12th July 1915 1915, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
Location of construction for a vessel’s engines.
Wallsend on Tyne ( Form for Vessels of 100 Tons & Upwards for Morpeth, 18th October 1902 1902 )
Newcastle ( Report on Machinery for Morpeth, 11th October 1902 1902, Report of Survey for Repairs, &c, of Engines & Boilers for Dimitrios, 18th August 1915 1915 )
The name of the port/place from which a vessel’s voyage originated.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.