Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
12/04/1923
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Dobson & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5776
The listed port to which a given vessel belongs.
Dubrovnik
The date of first visit by a surveyor.
15/02/1923
The individual and/or organisation listed
Navigazione Libera Giovanni Racich & Co
Location where the document is written.
Trieste
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
05/07/1940
Name of ship as recorded on the record
Izgled
The process of transferring a vessel to water, but not necessarily her completion.
14/02/1911
Unique identifier for a given ship, it is assigned by a builder.
169
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Tri
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Fittings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/03/1923
Name of the individual/entity/organisation responsible for authoring the record
L Stuparich
Location where a vessel’s survey was undertaken.
Trieste
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5032
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
English Channel
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.