Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

31/07/1911

The year in which a vessel’s construction is completed.

Year of ship completion

1892

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Grangemouth Dockyard Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Grangemouth

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

60771

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Barcelona 768

The date of first visit by a surveyor.

Date of first survey

24/07/1911

The individual and/or organisation listed

Ship owner

Mazout Co of Baku

Location where the document is written.

Location of Document Creation

Newcastle on Tyne

Location where a vessel’s survey was undertaken.

Location of Survey

North Shields

The name of the port/place of destination given.

Destined voyage

Baltic

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Number of lives lost

15

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

26/04/1914

Name of ship as recorded on the record

Ship name

Ciudad de Reus

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/12/1892

Unique identifier for a given ship, it is assigned by a builder.

Yard no

174

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Nwc

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

8 Report of Survey for Repairs, &c.

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

31/07/1911

Name of the individual/entity/organisation responsible for authoring the record

Document author

G L Brown

Name of surveyor.

Surveyor

G L Brown

Recorded information related to a vessel’s movements.

Voyage information

North Shields; Baltic

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

1608

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Off of Cape Caxine

Physical extent of a record.

Number of parts

1