Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

18/03/1903

The year in which a vessel’s construction is completed.

Year of ship completion

1892

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Grangemouth Dockyard Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Grangemouth

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Barry 6247

The individual and/or organisation listed

Ship owner

Sociedad La Mutua

Name of the individual/entity/organisation responsible for authoring the record

Document author

Thomas Sunner & Sons

The name of the port/place from which a vessel’s voyage originated.

Voyage from

Barry

A vessel’s means of propulsion.

Propulsion

Steam

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

1899

Location of construction for a vessel’s engines.

Location of engine build

Glasgow

Engine builder as written

Hutson and Corbett

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Off of Cape Caxine

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Ciudad de Reus

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/12/1892

Unique identifier for a given ship, it is assigned by a builder.

Yard no

174

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Undefined

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Roca

Location where the document is written.

Location of Document Creation

Liverpool

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tanker

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

3 Cylinder Triple Expansion Engine

Date in which construction of a vessel’s engines were completed.

Year of engine build

1893

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Number of lives lost

15

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

26/04/1914

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.