Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/12/1938
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Blyth Shipbuilding & Dry Docks Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Blyth
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
9745
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Cardiff 52181
The date of first visit by a surveyor.
12/12/1938
The individual and/or organisation listed
P G Cottaropoulos
Location where the document is written.
Marseilles
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Wreck report
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Torpedoed & Beached - now in port
Vessel’s place of loss or disposal/last known recorded location.
Llanza
The country or national waters where a vessel is lost/disposed of, or last recorded.
Spain
Physical extent of a record.
1
Name of ship as recorded on the record
Navarinon
The process of transferring a vessel to water, but not necessarily her completion.
12/03/1914
Unique identifier for a given ship, it is assigned by a builder.
176
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Msl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
12/12/1938
Name of the individual/entity/organisation responsible for authoring the record
M MacLeod
Location where a vessel’s survey was undertaken.
Marseilles
Date of the meeting of the Classing Committee.
03/01/1939
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1735
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed & Beached
Vessel’s area of loss or disposal/last known recorded location.
French Catalan Border
Recorded date for the vessel’s loss or disposal.
18/03/1938
Have you noticed missing or incorrect data or images for this document?