Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

07/01/1941

The year in which a vessel’s construction is completed.

Year of ship completion

1909

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Northumberland Shipbuilding Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Howden-on-Tyne

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

2620

The port in which a vessel is registered or permanently based.

Port of registry

Shanghai

The date of first visit by a surveyor.

Date of first survey

09/11/1940

The individual and/or organisation listed

Ship owner

G E Marden

Name of the individual/entity/organisation responsible for authoring the record

Document author

T Kunishi

Location where a vessel’s survey was undertaken.

Location of Survey

Shimonoseki

Date of the meeting of the Classing Committee.

Date of Classing committee

11/11/1941

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Stockton

Engine builder as written

Blair & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1941

Name of ship as recorded on the record

Ship name

Deslock

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

19/06/1909

Unique identifier for a given ship, it is assigned by a builder.

Yard no

162

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Smk

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

No title

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

17/12/1940

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Wheelock & Co

Location where the document is written.

Location of Document Creation

Shimonoseki

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+LMC 12,40

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5015

Date in which construction of a vessel’s engines were completed.

Year of engine build

1909

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1941

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.