Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
__/09/1864 ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
The port or place in which the vessel’s construction took place, at the time of writing.
Northfleet ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
The listed port to which a given vessel belongs.
London ( Iron Ships Report for Viper, 24th March 1865 1865 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
F T Parke ( Iron Ships Report for Viper, 24th March 1865 1865 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AC for River purposes only ( Iron Ships Report for Viper, 24th March 1865 1865 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
The year in which a vessel’s construction is completed.
1864 ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C J Mare & Co ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
George Wigg ( Iron Ships Report for Viper, 24th March 1865 1865 )
Location where a vessel’s survey was undertaken.
London ( Iron Ships Report for Viper, 24th March 1865 1865 )
Northfleet ( Midship Section Plan for Viper, 8th March 1865 1865 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Iron Ships Report for Viper, 24th March 1865 1865, Midship Section Plan for Viper, 8th March 1865 1865 )
Broad categories and subdivisions of vessels related to their purpose or function.
Paddle Steamer ( Midship Section Plan for Viper, 8th March 1865 1865 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.