Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/03/1865
The year in which a vessel’s construction is completed.
1864
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C J Mare & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Northfleet
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4037
Additional numbers that feature on a given record that may be used for identification.
London 26737
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/03/1865
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
F T Parke
Location where the document is written.
London
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AC for River purposes only
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Viper
The process of transferring a vessel to water, but not necessarily her completion.
__/09/1864
Name of the shipbuilder as it appears on the record.
H Cornish
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Iron Ships
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
06/03/1865
The individual and/or organisation listed
George Wigg
Name of the individual/entity/organisation responsible for authoring the record
B Waymouth
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
07/04/1865
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
437
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?