Name of ship as recorded on the record
Titan ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
31/01/1903 ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
24 ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Location where a vessel’s survey was undertaken.
Dusseldorf ( Engine Forgings Form for Titan, 13th October 1902 1902 )
Hull ( Plan of Steel Boiler for Titan, 7th February 1902 1902 )
Beverley; Hull ( Steel Steamer Report for Titan, 12th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903 )
Grimsby ( Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911 )
London ( Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
A vessel’s means of propulsion.
Steam ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911 )
undefined ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Is the steamer assisted by sail?
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Is electric lighting fitted to the vessel?
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Steel Steamer Report for Titan, 12th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903 )
Lon ( Report of Survey for Repairs, &c for Titan, Undated no date )
The individual and/or organisation listed
Thomas Robinson ( Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
T Robinson ( Memo regarding classification for Titan, 30th August 1911 1911 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; Steam Trawler; Lloyds A & CP; +LMC 3,03 ( Steel Steamer Report for Titan, 12th March 1903 1903 )
+LMC 3,03 ( Report on Machinery for Titan, 6th March 1903 1903 )
Withdraw Class & Insert . . . ( Report of Survey for Repairs, &c for Titan, Undated no date )
The name of the port/place of destination given.
Fishing ( Steel Steamer Report for Titan, 12th March 1903 1903 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
171 ( Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Memo regarding classification for Titan, 30th August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Bannister ( Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903 )
Date in which construction of a vessel’s engines were completed.
1903 ( Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903 )
The year in which a vessel’s construction is completed.
1903 ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cook, Welton & Gemmell ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Fishing ( Midship Section Plan for Titan, 1902 1902 )
Trawler ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911 )
Screw Steamer ( Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Location of construction for a vessel’s engines.
Is machinery fitted at the aft of the vessel?
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Engine Forgings Form for Titan, 13th October 1902 1902, Plan of Steel Boiler for Titan, 7th February 1902 1902, Midship Section Plan for Titan, 1902 1902, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Titan, 16th March 1903 1903, Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Report on Machinery for Titan, 6th March 1903 1903, Copy of Letter from Assistant to the Secretary, to Thomas Robinson Esq, Grimsby, regarding Titan, 31st August 1911 1911, Memo regarding classification for Titan, 30th August 1911 1911, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Letter from Thomas Robinson, to Lloyd\'s Registry, London, regarding Titan, 21st August 1911 1911, Note for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
The listed port to which a given vessel belongs.
Name of surveyor.
Joseph Thomson ( Steel Steamer Report for Titan, 12th March 1903 1903 )
James Innes ( Report on Machinery for Titan, 6th March 1903 1903 )
Recorded information related to a vessel’s movements.
Beverley; Hull; Fishing ( Steel Steamer Report for Titan, 12th March 1903 1903 )
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Steel Steamer Report for Titan, 12th March 1903 1903, Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 2 for Titan, 23rd August 1911 1911, Report of Survey for Repairs, &c for Titan, Undated no date )
The port in which a vessel is registered or permanently based.
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Inverted Cylinder ( Form for Vessels of 100 Tons & Upwards for Titan, 13th March 1903 1903 )
Triple Expansion ( Report on Machinery for Titan, 6th March 1903 1903 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.