Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The port or place in which the vessel’s construction took place, at the time of writing.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Brs ( Survey Report for Tilly, 18th June 1872 1872 )

The individual and/or organisation listed

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 for 6 Years; A & CP ( Survey Report for Tilly, 18th June 1872 1872 )

The name of the port/place of destination given.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

The listed port to which a given vessel belongs.

Port belonging to

Gloucester ( Survey Report for Tilly, 18th June 1872 1872 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Bristol; Coasting ( Survey Report for Tilly, 18th June 1872 1872 )

Physical arrangement of a ship’s masts, sails and rigging.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.