Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Talang Akar ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

24/08/1926 ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

107 ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Middlesbrough ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926 )

West Hartlepool ( Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926 )

London ( Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944 )

Haverton Hill on Tees; Middlesbrough ( Steel Steamer Report for Talang Akar, 30th September 1926 1926 )

West Hartlepool; Hartlepool ( Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926 )

Middlesbrough; West Hartlepool ( Report on Electric Fittings for Talang Akar, 5th October 1926 1926 )

Haverton Hill on Tees ( Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926 )

Glasgow ( Certificate of Testing for Talang Akar, 6th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926 )

Coatbridge ( Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926 )

Glasgow; Hartlepool ( Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926 )

Hartlepool ( Plan of Boilers for Talang Akar, 29th March 1926 1926 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The year in which a vessel’s construction is completed.

Year of ship completion

1926 ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Furness Shipbuilding Co Ltd ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Haverton Hill on Tees ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date )

undefined ( Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Letter from Cyril B Scorer, Surveyor, Lloyd's Register, Middlesbrough to The Secretary of Lloyd's Register, regarding the coating of the inner bottom plating under the boilers of Talang Akar, 9th October 1926 1926, Telegram from Storey, to the London Committee, regarding Talang Akar, 3rd December 1926 1926, Note regarding fees for Talang Akar, 1st December 1926 1926, Letter from R D Shilston, per The Surveyors, Lloyd's Register, West Hartlepool to The Secretary of Lloyd's Register, regarding the boiler plans & notes for Talang Akar, 9th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Talang Akar, 6th October 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Talang Akar, 5th October 1926 1926, Letter from Assistant Secretary, Lloyd's Register, London to The Surveyors, Lloyd's Register, West Hartlepool, regarding items needed to complete the classification survey for Talang Akar, 5th October 1926 1926, Steel Steamer Report for Talang Akar, 30th September 1926 1926, Request for Special Survey of Boilers & Engines for Talang Akar, 25th March 1926 1926, Report of Survey for Repairs, &c for Talang Akar, 3rd October 1926 1926, Report on Steam Reciprocating Engine Machinery for Talang Akar, 1st October 1926 1926, Memo requesting boiler plan for Talang Akar, 8th October 1926 1926, Report on Boilers for Talang Akar, 1st October 1926 1926, Report on Electric Fittings for Talang Akar, 5th October 1926 1926, Half Midship Section Plan for Talang Akar, 10th March 1926 1926, Half Midship Section & Oiltight Transverse Bulhead Plan for Talang Akar, 8th October 1926 1926, Profile & Deck Plans for Talang Akar, 10th March 1926 1926, Certificate of Testing for Talang Akar, 6th July 1926 1926, Advice note detailing quantity of steel for Talang Akar, 8th July 1926 1926, Certificate of Testing for Talang Akar, 8th July 1926 1926, Advice note detailing quantity of steel tube for Talang Akar, 3rd July 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 4th May 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 20th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 22nd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 30th April 1926 1926, Advice note from David Colville & Sons Ltd to Richardsons Westgarth & Co Ltd regarding Steel Boiler Plates for Talang Akar, 23rd April 1926 1926, Advice note from David Colville & Sons Ltd to Richardson Westgarth Co Ltd regarding Materials for Talang Akar, 16th June 1926 1926, Plan of Boilers for Talang Akar, 29th March 1926 1926, Profile & Deck Plan for Talang Akar, 8th October 1926 1926, Report of Survey for Repairs, &c for Talang Akar, April 1944 1944, Form of Postponed Surveys for Talang Akar, Undated no date, Note regarding the omission of Talang Akar from the R Department, Undated no date )

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

The port in which a vessel is registered or permanently based.