Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/10/1926
The year in which a vessel’s construction is completed.
1926
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness Shipbuilding Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
107
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
The listed port to which a given vessel belongs.
s-Gravenhage
The date of first visit by a surveyor.
08/06/1926
The individual and/or organisation listed
N V Nederlandsche Koloniale Petroleum Maatschappij
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Middlesbrough; West Hartlepool
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Talang Akar
The process of transferring a vessel to water, but not necessarily her completion.
24/08/1926
Name of the shipbuilder as it appears on the record.
J McGovern
The port or place in which the vessel’s construction took place, at the time of writing.
Haverton Hill on Tees
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Fittings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/10/1926
Name of the individual/entity/organisation responsible for authoring the record
W H Roberts; R D Shilston
Name of surveyor.
W H Roberts
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Elec Lt
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2010
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.