Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Soyo Maru ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
04/10/1930 ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
270 ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
The individual and/or organisation listed
Toyo Kisen Kabushiki Kaisha ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
A vessel’s means of propulsion.
undefined ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Motor (internal combustion) ( Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date )
Steam ( Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930 )
Is the steamer assisted by sail?
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Name of surveyor.
Alexander Fletcher ( Ship Forgings Form for Soyo Maru, 31st May 1930 1930 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Yka Rpt 4640 ( Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930 )
See Yka FE Rpt 4640 ( Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930 )
+100A1; Adapted for Carrying Oil 1,31; Fp above 150 F in Deep Tank Aft; Lloyd\'s A & CP; +LMC 1,31 Oil Eng; CL DB 100 lbs ( Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931 )
See Yka FE No 4640 ( Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931 )
+LMC 1,31 Oil Eng CL; DB 100 lbs ( Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931 )
See Yka Rpt 4640 F E ( Report on Boilers for Soyo Maru, 27th January 1931 1931 )
Elec Lt ( Report on Electric Fittings for Soyo Maru, 27th January 1931 1931 )
Omit Class on Reprint ( Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941 )
DBS 5,41; CS 5,41; S 5,41 ( Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
Location of construction for a vessel’s engines.
Kobe ( Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
VHJM ( Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931 )
Recorded information relating the specific cargo being conveyed.
The year in which a vessel’s construction is completed.
1930 ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Asano Shipbuilding Co Ltd ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Yokohama ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Location where a vessel’s survey was undertaken.
Yokohama ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931 )
Yokohama Japan ( Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930 )
Glasgow ( Ship Forgings Form for Soyo Maru, 31st May 1930 1930 )
Kobe ( Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941 )
Tsurumi; Yokohama ( Report on Electric Fittings for Soyo Maru, 27th January 1931 1931 )
Tama; Kobe ( Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5800 ( Request for Special Survey for Soyo Maru, 11th November 1929 1929 )
6081 ( Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey for Soyo Maru, 11th November 1929 1929, Plan of Rudder & Stern Frame for Soyo Maru, 5th March 1930 1930, Construction Profile & Deck & Tank Top Plan for Soyo Maru, 21th January 1930 1930, Half Midship Section Plan for Soyo Maru, 16th January 1930 1930, Half Midship Section Plan for Soyo Maru, 21st January 1930 1930, Letter from I Matusaki, for Toyo Kisen Kaisha, to Asano Ship Building Co Ltd, Yokohama, regarding Soyo Maru, 30th July 1930 1930, Ship Forgings Form for Soyo Maru, 31st May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 15th October 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 9th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 20th August 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination for Soyo Maru, 30th May 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 12th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination for Soyo Maru, 19th June 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 16th July 1930 1930, Copy of Certificate of Examination & Testing for Soyo Maru, 17th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 26th July 1930 1930, Copy of Certificate of Examination for Soyo Maru, 8th August 1930 1930, Copy of Certificate of Examination for Soyo Maru, 9th August 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Translation of Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 30th April 1931 1931, Letter from J F Nicholas, to The Secretary, London, regarding Soyo Maru, 30th March 1931 1931, Letter from A McGlashan, to The Secretary, London, regarding Soyo Maru, 25th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama regarding Soyo Maru, 25th February 1931 1931, Telegram in LR Private Code from Yokohama to the Committee, London, regarding Soyo Maru, 25th February 1931 1931, Copy of Cablegram in LR Private Code to Lloyd\'s Register, Yokohama, regarding Soyo Maru, 24th February 1931 1931, Translation of Cablegram in LR Private Code Sent to the Surveyor at Yokohama, regarding Soyo Maru, 24th February 1931 1931, Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Copy of Certificate of Survey of Damage & Repair for Soyo Maru, 9th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Copy of Certificate of Survey of Boiler & Machinery for Soyo Maru, 17th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Oil Engine Surveys Form for Soyo Maru, 1940? 1940, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Repairs for Soyo Maru, 6th May 1941 1941, Copy of Certificate of Survey of Donkey Boiler & Part of the Machinery for Soyo Maru, 6th May 1941 1941, Oil Engine Surveys Form for Soyo Maru, 1941? 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941, Memo stating that the class of Soyo Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 5th June 1942 1942, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Soyo Maru, Undated no date, List of Spare Gears for Main Engine & Main Engine Compressor for Soyo Maru, Undated no date, List of Spare Gears for Soyo Maru, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Kob ( Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
Yka ( Steel Steamer or Motorship Report for Soyo Maru, 28th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931 )
Type and configuration of the engine(s) supplied for a vessel.
Sulzer 2 SC SA ( Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931 )
43 CSA Airless Injection ( Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930 )
Oil Engines 2 S C S A ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Soyo Maru, 23rd February 1931 1931 )
Date in which construction of a vessel’s engines were completed.
1930 ( Report on Oil Engine Machinery for Soyo Maru, 2nd October 1930 1930, Report on Oil Engine Electric Generator Sets for Soyo Maru, 1st October 1930 1930, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931 )
1931 ( Report of Survey for Repairs, &c, of Engines & Boilers for Soyo Maru, 6th May 1941 1941 )
The port in which a vessel is registered or permanently based.
The listed port to which a given vessel belongs.
Yokohama ( Report of Survey for Repairs, &c for Soyo Maru, 2nd February 1931 1931, Report on Oil Engine Machinery for Soyo Maru, 27th January 1931 1931, Report on Boilers for Soyo Maru, 27th January 1931 1931, Report on Electric Fittings for Soyo Maru, 27th January 1931 1931, Report of Survey for Repairs, &c for Soyo Maru, 6th May 1941 1941 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.