Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Saturnus ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
The process of transferring a vessel to water, but not necessarily her completion.
18/08/1883 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
The country in which the vessel’s construction took place, at the time of writing.
The Netherlands ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
The country (flag) that a vessel is registered to, at the time of writing.
The Netherlands ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883 )
The individual and/or organisation listed
Koninklijke Nederlandsche Stoomboot Maatschappij ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883 )
Name of surveyor.
Jan C W Loos ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883 )
Willem F D van Ollefen ( Report on machinery for Saturnus, 11 September 1883 1883 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
957 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Does the vessel possess an auxiliary power source?
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Is electric lighting fitted to the vessel?
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Moulded dimensions breadth- Also referred to as moulded beam. The distance from the inside of the starboard side plating to the inside of the port side plating.
30' 6" ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
30.6 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9.83 ( Report on machinery for Saturnus, 11 September 1883 1883 )
The year in which a vessel’s construction is completed.
1883 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Delfshaven ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Rot ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
The listed port to which a given vessel belongs.
Amsterdam ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
Delfshaven; Rotterdam ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883 )
Is the steamer assisted by sail?
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
816 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
Is machinery fitted at the aft of the vessel?
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883, Remarks of the Chief Surveyor regarding Saturnus, 13 August 1883 1883, Report on machinery for Saturnus, 11 September 1883 1883, Correspondence memo regarding Saturnus, 20 September 1883 1883, Boiler plan for Saturnus, 30 January 1883 1883, Boiler plan for Saturnus, 3 February 1883 1883, Midship Section for Saturnus, 13 February 1883 1883, Ballast pipe plans for Saturnus for Saturnus no date, Ballast pipe plans for Saturnus for Saturnus no date, Longitudinal plan for Saturnus no date )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
209.97 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
15.17 ( Steel ship Report of Survey for Saturnus, 11 September 1883 1883 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.