Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Rolfsborg ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Skard ( Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/01/1915 ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

181 ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Fredriksstad ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913 )

Fredrikstad ( Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913 )

Christiania ( Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915 )

Fredrikstad; Christiania ( Steel Steamer Report for Skard, 8th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915 )

London ( Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945 )

Wokingham ( Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943 )

Wokingham; Hull ( Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945 )

Grimsby; Hull ( Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Collision ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

United Kingdom ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Lloyds A & CP +LMC 2,15 ( Steel Steamer Report for Skard, 8th March 1915 1915 )

+LMC 2,15 ( Report on Machinery for Skard, 5th March 1915 1915 )

+100A1 10,44; S S Hfs 2nd No 3-4,39; S S Gms No 1-43; Cargo Battens not fitted; +LMC 9,43; B S 10,44; TS 7-42 CL ( Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945 )

+100A1 10,44; S S 2nd No 3-4,39; S S No 1-43; +LMC 9,43; B S 10,44; TS 7,42 CL ( Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

The name of the port/place of destination given.

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1915 ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Fredrikstad Mekaniske Verksted ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Fredriksted ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

undefined ( Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Largo Bay ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

13/07/1945 ( Plan of Crank Shaft for Rolfsborg, 28th August 1913 1913, Midship Section Plan for Rolfsborg, 29th March 1913 1913, Longitudinal Section & Deck Plans for Rolfsborg, 3rd October 1913 1913, Plan of Boilers for Rolfsborg, 15th November 1913 1913, Plan of Shafting for Skard, 5th November 1913 1913, Memo regarding amended reports for Skard, 1st April 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, regarding survey, dimensions & measurements of Skard, 26th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding machinery & electric lighting installation for Skard, 9th March 1915 1915, Steel Steamer Report for Skard, 8th March 1915 1915, Letter from Ludv C A Lystad, Lloyd's Register, Christiania, to the Secretary, London, regarding coupling bolts & electric lighting installation for Skard, 7th April 1915 1915, Letter from Secretary, Lloyd's Register, London, to the Surveyors, Christiania, regarding first entry machinery report, coupling bolts & electric lighting installation for Skard, 17th March 1915 1915, Memo regarding electric light cables for Skard, 16th March 1915 1915, Memo regarding sea connection & rudder of Skard, 16th March 1915 1915, Report on Machinery for Skard, 5th March 1915 1915, Report on Electric Lighting Installation for Skard, 15th February 1915 1915, Letter from Secretary to L C A Lystad Esq, Lloyd's Register, Christiania, regarding dimensions & measurements for Skard, 17th March 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding first entry of class of Skard, 17th March 1915 1916, Letter from Pro Secretary to the Surveyors, Ispwich, regarding bulwark plans for Rolfsborg, 27th October 1943 1943, Letter from the Secretary, Lloyd's register, London to Richard W Jones & Co, Newport, Mon, regarding collision sinking of Rolfsborg, 7th November 1945 1945, Question & Answer Memo between Wokingham & Hull Office regarding survey for Rolfsborg, 4th September 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the docking of Rolfsborg, 24th July 1945 1945, Report of Survey for Repairs, &c for Rolfsborg, 7th July 1945 1945, Report of Total Loss, Casualty, &c for Rolfsborg, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Fredrikstad; London ( Steel Steamer Report for Skard, 8th March 1915 1915 )

Location of construction for a vessel’s engines.

Location of engine build

Fredrikstad ( Report on Machinery for Skard, 5th March 1915 1915 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.