Christ Mahlman ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Sardius ( Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Midship Section Plan for Sardius, Undated no date )

Christ Mahlmann ( Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946 )

Pluton ( Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date )

Christ Mahiman ( Thicknesses of Plating Form for Christ Mahiman, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/02/1926 ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

481 ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Beverley ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Midship Section Plan for Sardius, Undated no date )

Hull ( Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926 )

Sunderland ( Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925 )

Beverley; Hull ( Steel Steamer Report for Sardius, 1st April 1926 1926 )

London ( Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Report of Survey for Repairs, &c for Pluton, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Antwerp ( Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947 )

Ghent; Antwerp ( Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946 )

London; Antwerp ( Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947 )

Bremen ( Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950 )

Bremerhaven; Bremen ( Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950 )

Bremerhaven ( Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950 )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

undefined ( Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1926 ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cook, Welton & Gemmell ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Beverley ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date )

Trawler ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Rudder & Stern Frame for Christ Mahlman, 1925 1925, Profile & Decks Plan for Sardius, 1925 1925, Request for Special Survey of Boilers & Engines for Sardius, 21st December 1925 1925, Ship Forgings Form for Sardius, 26th November 1925 1925, Ship Forgings Form for Sardius, 11th December 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 12th April 1926 1926, Steel Steamer Report for Sardius, 1st April 1926 1926, Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926, Report on Machinery for Sardius, 26th March 1926 1926, Report on Electric Fittings for Sardius, 26th March 1926 1926, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 14th November 1945 1945, Letter from F L Rabaey, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th November 1945 1945, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Christ Mahlman, 17th September 1946 1946, Report of Survey for Repairs, &c for Christ Mahlmann, 29th August 1946 1946, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Christ Mahlmann, 19th September 1946 1946, Letter from G A Valckeneers, Engineer Surveyor to Lloyd\'s Register, to Soc Anon Armement Ostendais, Ostend, regarding Christ Mahlman, 29th August 1946 1946, Report of Survey for Repairs, &c, of Engines & Boilers for Christ Mahlmann, 29th August 1946 1946, Report on Electrical Equipment for Christ Mahlmann, 29th August 1946 1946, Question & Answer Memo between London & Antwerp Office, regarding Christ Mahlman being Boiler Survey, 23rd October 1947 1947, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Antwerp, regarding Christ Mahlman, 16th July 1947 1947, Letter from R Lascelles, per The Surveyors, to The Secretary, London, regarding Christ Mahlman, 8th July 1947 1947, Letter from J P Gateley, to The Secretary, London, regarding Pluton, 21st November 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Periodical Special Survey of Pluton, 13th November 1950 1950, Report of Survey for Repairs, &c for Pluton, 19th October 1950 1950, Copy of Certificate of Survey of Repairs for Christ Mahlman, 12th September 1950 1950, Copy of Certificate of Survey of Boiler & Machinery for Christ Mahlman, 12th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Pluton, 19th October 1950 1950, Memo for Pluton, 7th December 1951 1951, Midship Section Plan for Sardius, Undated no date, Form of Postponed Surveys for Pluton, Undated no date, Report of Survey for Repairs, &c for Pluton, Undated no date, Thicknesses of Plating Form for Christ Mahiman, Undated no date, Thicknesses of Plating Form for Pluton, Undated no date, Note for Christ Mahlman, Undated no date, Report of Survey for Repairs, &c for Christ Mahlman, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Reciprocating Steam Triple Expansion Direct Acting Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Sardius, 22nd March 1926 1926 )

Triple Expansion ( Report on Machinery for Sardius, 26th March 1926 1926 )