Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Petrolea ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/11/1889 ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Stockton ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Gateshead ( Boiler plan for Petrolea, 20 November 1888 1888, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889 )

Newcastle-upon-Tyne ( Report on ship forgings for Petrolea, 1889 1889, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890 )

Stockton-on-Tees ( Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890 )

West Hartlepool ( Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892 )

Stockton-on-Tees; Hartlepool ( Iron ship report for Petrolea, 19 January 1890 1890 )

Gateshead; Newcastle; Newcastle-upon-Tyne ( Report on machinery for Petrolea, 3 January 1890 1890 )

Type of fuel used onboard a vessel.

Fuel

Steam - Oil ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

The country (flag) that a vessel is registered to, at the time of writing.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).

The country, at the time of writing, where a vessel’s engines were constructed.

Length of a ship along the summer load line from the vessel’s stem to the sternpost.

Length between perpendiculars

291 ( Iron ship report for Petrolea, 19 January 1890 1890 )

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

The year in which a vessel’s construction is completed.

Year of ship completion

1889 ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Craig, Taylor & Co Ltd ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Boiler plan for Petrolea, 20 November 1888 1888, Report on ship forgings for Petrolea, 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 30 January 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 25 February 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 4 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 6 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 20 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 27 March 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 3 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 5 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 17 April 1889 1889, Press copy of receipt related to boiler no. 687 for Petrolea, 18 April 1889 1889, Midship section plan for Petrolea, 25 April 1890 1890, Sketch showing stiffening of bulkheads for Petrolea, 25 April 1890 1890, Letter from Craig, Taylor & Co to John F Walliker, Newcastle surveyor, on the donkey boiler of Petrolea, 9 January 1890 1890, Letter from Allison B Wilson, Hartlepool surveyor, to the Secretary of Lloyd's Register, enclosing the approved plans for Petrolea, 10 January 1890 1890, Iron ship report for Petrolea, 19 January 1890 1890, Particulars for record of iron decks for Petrolea, 3 January 1890 1890, Particulars for record of double bottoms for Petrolea, 3 January 1890 1890, Particulars for record of material of boilers for Petrolea, 7 January 1890 1890, Report on machinery for Petrolea, 3 January 1890 1890, Copy of telegram received from the surveyors at West Hartlepool regarding oil tank of Petrolea, 13 March 1892 1892, Note attached to receipts related to the boiler of Petrolea no date, Memo stating that the duplicate plans will be forwarded as soon as they are obtained from the builders of Petrolea no date )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The listed port to which a given vessel belongs.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The name of the port/place from which a vessel’s voyage originated.

Predominant material(s) utilised in a vessel’s construction.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Location of construction for a vessel’s engines.

Date in which construction of a vessel’s engines were completed.

Depth of vessel at ship’s side from the highest point of the upper deck to the lowest point of the keel.

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.