Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/01/1890
The year in which a vessel’s construction is completed.
1889
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Craig, Taylor & Co Ltd
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
23654
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hartlepool 7856
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
19/12/1888
The individual and/or organisation listed
Alfred Suart
Name of the individual/entity/organisation responsible for authoring the record
John F Walliker
Name of surveyor.
John F Walliker
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 1.90
The name of the port/place from which a vessel’s voyage originated.
Newcastle-upon-Tyne
Type of fuel used onboard a vessel.
Steam - Oil
The method of ship construction used.
Riveted
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2331
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
Triple expansion, 3 cranks
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom
Black, Hawthorn & Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Name of ship as recorded on the record
Petrolea
The process of transferring a vessel to water, but not necessarily her completion.
23/11/1889
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Machinery
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
03/01/1890
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Lloyd
Location where the document is written.
Newcastle-upon-Tyne
Location where a vessel’s survey was undertaken.
Gateshead
Date of the meeting of the Classing Committee.
21/01/1890
A vessel’s means of propulsion.
Steam
Predominant material(s) utilised in a vessel’s construction.
Iron
Is the steamer assisted by sail?
No
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1516
Location of construction for a vessel’s engines.
Gateshead
Date in which construction of a vessel’s engines were completed.
1889
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
250
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.