Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Marte ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Parkside ( Steel Boiler for Marte, 28th November 1899 1899 )

Marte; Parkside ( Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

09/12/1899 ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

45 ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Londonderry ( Form for Engine Forgings Marte, 11th November 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899 )

Glasgow ( Form for Ship Forging for Marte, 8th June 1899 1899, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900 )

Sunderland ( Form for Ship Forgings for Marte, 30th December 1899 1899 )

London ( Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900 )

Belfast ( Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900 )

Londonderry; Belfast ( Steel Steamer Report for Marte, 12th March 1900 1900 )

Glasgow; Belfast ( Report on Machinery for Marte, 1st March 1900 1900 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Londonderry; Cardiff ( Steel Steamer Report for Marte, 12th March 1900 1900 )

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1900 ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

The Londonderry Ship Building Co Ltd ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Londonderry ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900 )

undefined ( Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Form for Engine Forgings Marte, 11th November 1899 1899, Form for Ship Forging for Marte, 8th June 1899 1899, Form for Ship Forgings for Marte, 30th December 1899 1899, Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Letter from D McAuslan to the Secretary, London, replying to a query on Classing for Marte, 15th March 1900 1900, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from A G W, Secretary to the Surveyors, Newport, Regarding the request of the Report for Marte ex Parkside, 14th March 1900 1900, Telegram regarding fees paid for Marte 14th March 1900 1900, Remarks from the Chief Surveyor to the Classing Committee, Regarding Class of Marte, 13th March 1900 1900, Steel Steamer Report for Marte, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing that the previous was sent to wrong recipient, for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Telegram informing that Marte report has still not been returned as requested, 12th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Letter from Galuidy Bros to the Committee of Lloyds, informing on the works completion for Marte, 8th March 1900 1900, Telegram about Blind Flange fitting for The Marte, 10th March 1900 1900, Letter from Thomas J Dodd to the Secretary, London, questioning about working maintenance for Marte, 8th March 1900 1900, Telegram about the builders signature & the completion of works for Marte, 8th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Telegram asking for the first entry Report to forwarded for Marte, 8th March 1900 1900, Letter from Henry Hand & J Kerr to the Secretary, asking the acknowledgment of the reception of a telegram for Marte, 7th March 1900 1900, Telegram about necessary repairs & a written guarantee of the work for Marte, 7th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900, Telegram regarding classing for Marte, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Letter from pro Secretary A Scott to the Surveyors, Belfast, regarding the design submitted for consideration for the Pumping Arrangements for Marte, 8th June 1899 1899, Steel spar deck steamer for Marte, 21st March 1899 1899, Plan of Midship Section for Marte, 21st March 1899 1899, Stern & Rudder frames for Parkside, 2nd May 1899 1899, Amended side stringer plan for Parkside, 2nd May 1899 1899, Plan of Rudder for Marte, 3rd March 1899 1899, Plan of Donkey Boilers for Marte, 28th November 1899 1899, Steel Boiler for Marte, 28th November 1899 1899, Propsed Stiffening of After Peak & Bulkhead for Marte, 12th April 1899 1899, Pumping Plan for Marte, 5th June 1899 1899, Query form regarding change of name from Parkside to Marte, 7th March 1900 1900, Letter from R W Austin to the Secretary, London, Regarding acknowledgment of a telegram sent by the Belfast Surveyors for Marte, 12th March 1900 1900, Telegram informing the Committee that it was sent to the wrong recipient, for Marte, 12th March 1900 1900, Telegram informing that Vessel Marte's report is with the classing committee causing delay, 13th March 1900 1900, Letter from R W Austin to the Secretary, London, confirm the sending of a telegram about the Fitting of Blind Flange for Marte, 9th March 1900 1900, Telegram about the forwarding of the first entry Report for Marte, 8th March 1900 1900, Report on Machinery for Marte, 1st March 1900 1900, Form for the tracing of Midship Section plan for Marte, 12th March 1900 1900, Confirmation Telegram from James Turpin to the Committe, London, asking for the Certificate to be forwarded for Marte, 14th March 1900 1900 )

The individual and/or organisation listed

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1 Steel; Spar Dk; LA+Cp; +LMC 3,00 ( Steel Steamer Report for Marte, 12th March 1900 1900 )

+LMC 3,00 ( Report on Machinery for Marte, 1st March 1900 1900 )

The name of the port/place of destination given.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Location of construction for a vessel’s engines.

Location of engine build

Glasgow ( Report on Machinery for Marte, 1st March 1900 1900 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.