Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Marietta Ralli ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

19/10/1891 ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

187 ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date )

undefined ( Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Note Regarding Marietta Ralli, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Recorded information related to a vessel’s movements.

Voyage information

West Hartlepool; Constantinople ( Steel Steamer Report for Marietta Ralli, 28th November 1891 1891 )

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Compound Direct Acting ( Report on Machinery for Marietta Ralli, 25th November 1891 1891 )

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1891 ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Furness Withy & Co Ltd ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

West Hartlepool ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Greenock ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891 )

West Hartlepool; Hartlepool ( Steel Steamer Report for Marietta Ralli, 28th November 1891 1891 )

West Hartlepool ( Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891 )

Sunderland; Hartlepool ( Report on Machinery for Marietta Ralli, 25th November 1891 1891 )

Stockton on Tees ( Plan of Steel Boiler for Marietta Ralli, 1891 1891 )

Sunderland ( Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Plan of Boiler for Marietta Ralli, 27th January no date )

Darlington ( Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891 )

Glasgow; Sunderland ( Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891 )

Glasgow ( Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891 )

London ( Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Letter from Thomas Phillips, to the Secretary of Lloyd's Register, regarding chains & first entry report for Marietta Ralli, 9th December 1891 1891, Memo from G S regarding first entry report & length of chains for Marietta Ralli, 8th December 1891 1891, Steel Steamer Report for Marietta Ralli, 28th November 1891 1891, Freeboard Verification Form for Steamers for Marietta Ralli, 27th November 1891 1891, Report on Machinery for Marietta Ralli, 25th November 1891 1891, Plan of Steel Boiler for Marietta Ralli, 1891 1891, Plan of Pumping Arrangement for Marietta Ralli, 19th September 1891 1891, Ship Forgings & Castings form for Marietta Ralli, 1st October 1891 1891, Plan of Cast Steel Stem for Marietta Ralli, 10th June 1891 1891, Plan of Cast Steel Screw Frame for Marietta Ralli, 23rd May 1891 1891, Letter from Alexander Douglas, for the Hartlepool Surveyors, to the Secretary of Lloyd's Register, regarding plans & first entry report of Marietta Ralli, 7th December 1891 1891, Receipt for materials manufactured by The Wear Steel Co Ltd for Marietta Ralli, 10th June 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 30th May 1891 1891, Receipt for Boiler manufactured by The Wear Steel Co Ltd for Marietta Ralli, 28th May 1891 1891, Receipt for Marietta Ralli, 25th May 1891 1891, Receipt for Marietta Ralli, 14th May 1891 1891, Receipt for Steel Plates manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 4th June 1891 1891, Receipt for Marietta Ralli, 6th June 1891 1891, Receipt for Plates Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 17th January 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland Ltd for Marietta Ralli, 15th July 1891 1891, Receipt for Materials Manufactured by The Steel Co of Scotland for Marietta Ralli, 27th June 1891 1891, Receipt for Materials Manufactured by William Beardmore & Co for Marietta Ralli, 27th July 1891 1891, Report of Survey for Repairs, &c for Marietta Ralli, 20th March 1894 1894, Plan of Boiler for Marietta Ralli, 27th January no date, Note Regarding Marietta Ralli, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

Location of construction for a vessel’s engines.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.