Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

Year of ship completion

1940 ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Hamilton & Co Ltd ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942 )

Steam ( Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Missing ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

11/03/1943 ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Broad categories and subdivisions of vessels related to their purpose or function.

Recorded information related to a vessel’s movements.

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

25/06/1940 ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

440 ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

London ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940 )

Greenock ( Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940 )

Glasgow ( Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940 )

Manchester ( Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940 )

Port Glasgow; Greenock ( Steel Steamer Report for Lulworth Hill, 12th September 1940 1940 )

Port Glasgow; Glasgow ( Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940 )

Port Glasgow ( Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940 )

Hull ( Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Left & has not been heard of since ( Letter from N Kulukundis, Director of Rethymnis & Kulukundis Ltd, Shipbrokers, London, to William Hamilton & Co Ltd, Shipbuilders, Port Glasgow, agreeing as agents acting for Owners to building per plan of Lulworth Hill, 22nd June 1939 1939, Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Letter from T Munster per Manchester Surveyors to Secretary of Lloyd's Register, Wokingham, enclosing copy of letter from Russell Newbury & Co Ltd, Glasgow, regarding their recently constructed Auxiliary Engines for Lulworth Hill, 9th September 1940 1940, Letter from William Hamilton & Co Ltd, Shipbuilders, to Russell Newbery Co Ltd, Altrincham, Engine Builders, regarding informing witness to dynamo tests in Glasgow to forward dynamo Certificates for Lulworth Hill, 5th September 1940 1940, Memo regarding vessel type, construction, scantlings & required notation regarding omission of tween deck portions of bulkheads not extending to shelter deck of Lulworth Hill, 30th April 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Left & has not bee heard of since ( Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Oil Engine Electric Generator Sets for Lulworth Hill, 29th May 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942 )

Left; Missing ( Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942 )

Name of ship as recorded on the record

Ship name

Lulworth Hill ( Request for Special Survey of Boilers & Engines of Lulworth Hill, 13th June 1939 1939, Extract from Freeboard Verification of Marking Form for Lulworth Hill, 8th October 1940 1940, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding the first entry Lulworth Hill, 7th October 1940 1940, Letter from C R Willis, Secretary to Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, correcting the fitting of Newbury Oil Engine for auxiliary generator & attaching correct report for Lulworth Hill, 21st September 1940 1940, Steel Steamer Report for Lulworth Hill, 12th September 1940 1940, Certificate of Survey of Hull for Lulworth Hill, 11th September 1940 1940, Form for Vessels of 100 Tons & Upwards for Lulworth Hill, 21st August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Lulworth Hill, 30th September 1940 1940, Certificate of Survey of Boiler & Machinery for Lulworth Hill, 13th September 1940 1940, Report on Steam Reciprocating Engine Machinery for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Boilers for Lulworth Hill, 11th September 1940 1940, Report on Electrical Equipment for Lulworth Hill, 21st August 1940 1940, Profile & Decks Plan, as built, for Lulworth Hill, 30th August 1940 1940, Plan of Half Midship Section, as built, for Lulworth Hill, 30th August 1940 1940, Remarks from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs of Lulworth Hill, 27th October 1942 1942, Report of Survey for Repairs, &c for Lulworth Hill, 10th October 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Lulworth Hill, 10th October 1942 1942, Report of Total Loss, Casualty, &c for Lulworth Hill, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The name of the port/place from which a vessel’s voyage originated.

The name of the port/place of destination given.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.