Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Islam ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
The process of transferring a vessel to water, but not necessarily her completion.
22/10/1892 ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Unique identifier for a given ship, it is assigned by a builder.
257 ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Location where a vessel’s survey was undertaken.
Belfast ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892 )
Glasgow ( Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Steamer Report for Islam, 17th December 1892 1892 )
The individual and/or organisation listed
Islam Steamship Co Ltd ( Steel Steamer Report for Islam, 17th December 1892 1892 )
D & W Henderson, ( Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893 )
E Bates & Sons ( Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R Poland ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 Steel; LA & CP; +LMC 12,92; 2 DKs (Steel U WS) ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Deferred for a short time ( Report of total loss and casualty for Islam, 12 January 1893 1893 )
Deferred ( Report of total loss and casualty for Islam, 24 April 1893 1893 )
Deferred for further news ( Report of total loss and casualty for Islam, 20 February 1893 1893 )
The name of the port/place of destination given.
Bombay ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Bombay (Mumbai) ( Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5402 ( Steel Steamer Report for Islam, 17th December 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
5286 ( Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Recorded information relating the specific cargo being conveyed.
The year in which a vessel’s construction is completed.
1892 ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
A vessel’s means of propulsion.
Steam ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
undefined ( Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892 )
Is the steamer assisted by sail?
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan with a Detailed Sketch of Hold Beam for Islam, 15th April 1891 1891, Sectional Elevation Plan for Islam, 16th November 1891 1891, Main Boiler Plan for Islam, 12th December 1891 1891, Plan of Main Boiler for Islam, 14th December 1891 1891, Steel Steamer Report for Islam, 17th December 1892 1892, Ship Forgings or Casting Form for Islam, 1st June 1892 1892, Test Room Sheet respecting Boss arms for Islam, carried out at Steel Co of Scotland, 1st June 1892 1892, Test Room Sheet respecting Stern Frame for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Test Room Sheet respecting Stern Piece for Islam, carried out at Steel Co of Scotland, 31st March 1892 1892, Pumping Arrangement Plan for Islam, 23th September 1892 1892, Lower Deck Plan for Islam, 1892 1892, Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
The listed port to which a given vessel belongs.
Liverpool ( Steel Steamer Report for Islam, 17th December 1892 1892 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
C Bates & Sons ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Name of surveyor.
James Turpin ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Recorded information related to a vessel’s movements.
Belfast; Cardiff; Bombay ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Cadiz ( Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Islam, 17th December 1892 1892 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
3507 ( Case note regarding the total loss and repairs of the vessel Islam, 31 October 1893 1893, Report of total loss and casualty for Islam, 12 January 1893 1893, Report of total loss and casualty for Islam, 24 April 1893 1893, Report of total loss and casualty for Islam, 20 February 1893 1893, Note reporting the casualties involving the vessel Islam no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.