Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Heliopolis ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Royal George ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922 )
The process of transferring a vessel to water, but not necessarily her completion.
28/05/1907 ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Unique identifier for a given ship, it is assigned by a builder.
449 ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Location where a vessel’s survey was undertaken.
Govan Glasgow ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Half Midship Section Plan for Heliopolis, 15th November 1907 1907 )
Glasgow ( Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907 )
London ( Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922 )
Southampton ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920 )
Liverpool ( Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922 )
36 Feldstrasse, Bremen ( Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922 )
71 Fenchurch Street, London ( Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922 )
A vessel’s means of propulsion.
Steam ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
undefined ( Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906 )
Is the steamer assisted by sail?
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Is machinery fitted at the aft of the vessel?
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
George Gregory ( Steel Steamer Report for Heliopolis, 15th November 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907 )
G W Melson ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920 )
Recorded information related to a vessel’s movements.
Glasgow; Marseilles ( Steel Steamer Report for Heliopolis, 15th November 1907 1907 )
Southampton; New York ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920 )
Plymouth; Cherbourg; Falmouth; Wilhelmshaven ( Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Physical arrangement of a ship’s masts, sails and rigging.
The port in which a vessel is registered or permanently based.
London ( Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907 )
Liverpool ( Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Form of Postponed Surveys for Royal George, 21st April 1921 1921 )
Type and configuration of the engine(s) supplied for a vessel.
Rotary Compound Direct Acting ( Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907 )
Turbine ( Report on Machinery for Heliopolis, 6th November 1907 1907 )
Date in which construction of a vessel’s engines were completed.
The name of the yard where the vessel was built.
Fairfield ( Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
The year in which a vessel’s construction is completed.
1907 ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Fairfield Shipbuilding & Engineering Co Ltd ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Screw Steamer ( Steel Steamer Report for Heliopolis, 15th November 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Does the vessel possess an auxiliary power source?
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Is electric lighting fitted to the vessel?
No ( Shelter Deck Plan for Heliopolis, 20th August 1906 1906, Upper Deck Plan for Heliopolis, 20th August 1906 1906, Main Deck Planting Plan for Heliopolis, 6th September 1906 1906, Profile Plan for Heliopolis, 20th November 1906 1906, Plan of General Arrangement for Heliopolis, 1906 1906, Plan of Single Ended Boilers for Heliopolis, 1906 1906, Plan of Double Ended Boilers for Heliopolis, 12th July 1906 1906, Boat Deck Plan for Heliopolis, 20th August 1906 1906, Bridge Deck & Upper Promenade Deck Plan for Heliopolis, 20th August 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding the first entry for Royal George, 19th November 1907 1907, Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907, Half Midship Section Plan for Heliopolis, 15th November 1907 1907, Letter from R P Hutchins & Co to F A Mayne Esq, London, regarding collision damage repairs for Royal George, 17th June 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Docking of Royal George, 16th June 1920 1920, Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Letter from Secretary to The Secretary, Liverpool, regarding laying up & overdue boiler survey for Royal George, 23rd December 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey of Royal George, 21st December 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 20th December 1921 1921, Letter from Secretary to The Secretary, Liverpool, regarding laying up of Royal George, 19th December 1921 1921, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler survey arrangements & use as storeship of Royal George, 16th September 1921 1921, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 13th September 1921 1921, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding boiler survey arrangements for Royal George, 12th September 1921 1921, Letter from Secretary of Lloyd's Register London to The Secretary, Liverpool, regarding boiler survey arrangements for Royal George, 7th September 1921 1921, Letter from Secretary of Lloyd's Register to The Cunard Steam Ship Co Ltd, General Manager's Office, Liverpool, regarding boiler survey for Royal George, 22nd April 1921 1921, Form of Postponed Surveys for Royal George, 21st April 1921 1921, Letter from The Cunard Steam Ship Co Ltd to The Secretary, Lloyd's Register, London, regarding special survey of boilers for Royal George, 18th April 1921 1921, Memo to the Chief Ship Surveyor regarding Royal George, 11th January 1921 1921, Letter from John Lambert to The Secretary, Lloyd's Register, London, regarding work on sheerstrake plates for Royal George, 10th January 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding repairs to Royal George, 29th August 1922 1922, Letter from Assistant to the Secretary to G H C Bahr Esq, Bremen, regarding sale for break up of Royal George, 17th August 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee, per L R Hatton to A Scott Esq, London, regarding sale for break up of Royal George, 15th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding boiler & screwshaft arrangements for Royal George, 14th August 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding overdue boiler survey for Royal George, 14th July 1922 1922, Memo to the Chief Engineer Surveyor regarding the boiler survey for Royal George, 12th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding laying up of Royal George, 11th July 1922 1922, Letter from Assistant to the Secretary to The Secretary, Liverpool, regarding question whether vessel is still laid up for Royal George, 10th July 1922 1922, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, London, regarding Vessel still laid up for Royal George, 23rd March 1922 1922, Letter from Secretary to The Secretary, Liverpool, regarding screwshaft inspection & question whether vessel is still laid up for Royal George, 22nd March 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 21 September 1922 1922, Copy of Correspondence from the Assistant to the Secretary of Lloyd's Register London to G H C Bahr, Lloyd's Register surveyor at Bremen regarding the breaking up of Royal George, 13 September 1922 1922, Correspondence from G H C Bahr, Lloyd's Register surveyor at Bremen to the Secretary of Lloyd's Register London regarding the breaking up of Royal George, 25 August 1922 1922, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907 )
Sou ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920 )
The individual and/or organisation listed
Egyptian Mail Steam Ship Co Ltd ( Steel Steamer Report for Heliopolis, 15th November 1907 1907, Freeboard Verification Form for Steamers for Heliopolis, 28th October 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907 )
Cunard Steam Ship Co Ltd ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Form of Postponed Surveys for Royal George, 21st April 1921 1921 )
An American ( Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 (Steel) Shelter Deck With Freeboard; Lloyds A & CP ( Steel Steamer Report for Heliopolis, 15th November 1907 1907 )
+LMC 11,09 ( Report on Machinery for Heliopolis, 6th November 1907 1907 )
Deferred ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920 )
BS 2,20 ( Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920 )
+100A1 shelter deck with freeboard 6.20 ( Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
The name of the port/place of destination given.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
10897 ( Steel Steamer Report for Heliopolis, 15th November 1907 1907, Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907, Report on Machinery for Heliopolis, 6th November 1907 1907 )
11146 ( Report of Survey for Repairs, &c for Royal George, 11th June 1920 1920, Report of Survey for Repairs, &c, of Engines & Boilers for Royal George, 11th June 1920 1920, Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HLTW ( Form for Vessels of 100 Tons & Upwards for Heliopolis, 15th November 1907 1907 )
Location of construction for a vessel’s engines.
Name of surveyor.
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
5685 ( Report of Total Loss and Casualty for Royal George, 28 September 1922 1922 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.