Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Glen Tanar ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date )

Glen-Tanar ( Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884 )

Saint Simon ( Report of Survey for Repairs, &c for Saint Simon, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/08/1884 ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

320 ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Aberdeen ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897 )

Glasgow ( Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883 )

Newton; Dundee ( Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888 )

London ( Report of Survey for Repairs, &c for Saint Simon, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date )

undefined ( Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1884 ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Alexander Hall & Co ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Aberdeen ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Midship Section Plan for Glen Tanar, 19th June 1883 1883, Longitudinal Section Plan for Glen Tanar, 19th June 1883 1883, Spar Deck Plan for Glen Tanar, 23rd June 1883 1883, Tests of Boiler Steel for Glen Tanar, 20th August 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 9th August 1883 1883, Tests of Boiler Steel for Glen Tanar, 30th July 1883 1883, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 27th July 1883 1883, Tests of Boiler Steel for Glen Tanar, 21st September 1883 1883, Plan of Boiler for Glen Tanar, 1883 1883, Plan of Pumping Arrangement for Glen Tanar, 15th July 1884 1884, Letter from Thomas W Kettle, to The Secretary, regarding Glen Tanar, 1st October 1884 1884, Iron Ship Report for Glen Tanar, 20th September 1884 1884, Report on Machinery for Glen-Tanar, 19th September 1884 1884, Report of Survey for Repairs, &c for Glen-Tanar, 22nd November 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 25th November 1884 1884, Advice Note from The Steel Co of Scotland Ltd, to Brown & Tawse, regarding Bars for Glen Tanar, 30th March 1888 1888, Report of Survey for Repairs, &c, of Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 12th September 1888 1888, Report of Survey for Repairs, &c, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c, of Engine & Boilers, for Glen Tanar, 20th August 1889 1889, Report of Survey for Repairs, &c for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 6th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd August 1893 1893, Report of Survey for Repairs, &c for Glen Tanar, 3rd March 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Glen Tanar, 3rd March 1897 1897, Press Copy of Advice Note to Brown & Tawse, regarding Boiler Plates for Glen Tanar, 18th July no date, Report of Survey for Repairs, &c for Saint Simon, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Direct Acting Compound Inverted Cylinders Surface Condensing ( Report on Machinery for Glen-Tanar, 19th September 1884 1884 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.