Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1884
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Alexander Hall & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
59858a
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 35913
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
London
Date of the meeting of the Classing Committee.
17/05/1898
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Saint Simon
The process of transferring a vessel to water, but not necessarily her completion.
23/08/1884
Unique identifier for a given ship, it is assigned by a builder.
320
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
Havre
The individual and/or organisation listed
société navale de l'ouest
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Withdraw Class & Insert...
Physical arrangement of a ship’s masts, sails and rigging.
Bn - Brigantine
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1524
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.