Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Arabien ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932 )

Germar ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

31/01/1911 ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

846 ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle on Tyne ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911 )

Walker; Newcastle on Tyne; Newcastle On Tyne ( Steel Steamer Report for Arabien, 3rd March 1911 1911 )

Newcastle ( Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911 )

London; Bremen ( Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933 )

London ( Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Bremerhaven; Bremen ( Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931 )

Bremen ( Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933 )

A vessel’s means of propulsion.

Propulsion

Steam ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

undefined ( Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Will be broken up ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

The individual and/or organisation listed

Ship owner

Det Ostasiatiske Kompagni ( Report on Electric Lighting Installation for Arabien, 1st March 1911 1911 )

Ostasiatiske Kompagni Aktieselskabet ( Steel Steamer Report for Arabien, 3rd March 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911 )

Aktie de Octasiaiske Kompagni ( Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911 )

\'Globus\' Rhederei A G ( Form of Postponed Surveys for Germar, 11th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932 )

'Globus' Rhederei A G ( Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932 )

Globus Rhederei Akt Ges ( Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933 )

Rederei-Treuhand Gesellschaft ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933 )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Ostasiatiske Kompagni Aktieselskabet ( Steel Steamer Report for Arabien, 3rd March 1911 1911 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Triple Expansion ( Report on Machinery for Arabien, 1st March 1911 1911 )

The year in which a vessel’s construction is completed.

Year of ship completion

1911 ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Swan, Hunter & Wigham Richardson Ltd ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Walker, Newcastle ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000 ( Profile & Deck Plan for Arabien, 18th June 1910 1910, Half Midship Section Plan for Arabien, 18th June 1910 1910, Report on Electric Lighting Installation for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Newcastle Report, submitting eligible to be class stated \'Shelter deck with freeboard\' for Arabien, 9th March 1911 1911, Steel Steamer Report for Arabien, 3rd March 1911 1911, Freeboard Verification Form for Steamers for Arabien, 15th February 1911 1911, Report on Machinery for Arabien, 1st March 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Bremen Report on 2nd S S No 2 Partly Held due 4,31, repairs done & works to complete survey, submitting action be deferred for Germar, 16th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th August 1931 1931, Letter from the Secretary of Lloyd's Register to G H C Bahr Esq, Bremen Surveyor, regarding Committee agreeable to 2nd S S No 2 & Boiler Survey being postponed for the present for laid up Germar, 12th May 1931 1931, Form of Postponed Surveys for Germar, 11th May 1931 1931, Question & Answer Memo between London & Bremen Office regarding Special Survey & Boiler Survey for Germar, 4th May 1931 1931, Report of Survey for Repairs, &c for Germar, 8th September 1931 1931, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Bremen Report on Special Survey of Engines & Boilers Partly Held for S S No 2, submitting proposal to complete survey merits approval for Germar, 16th September 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Germar, 8th September 1931 1931, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 6th December 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing that question of breaking up not yet decided for Germar, 7th November 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors requesting confirmation of reports in Shipping Papers of to be broken up of Germar, 31st October 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors acknowledging receipt of signed form of undertaking for Germar, 12th September 1932 1932, Letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register enclosing letter from Owners regarding prospect of being broken up together with form of undertaking for Germar, 9th September 1932 1932, Letter in German from J A W Koln of \'Globus\' Reederei A G, Owners, to Lloyd\'s Register, Bremen, regarding Arabien, 7th September 1932 1932, Agreement of Laying Up of Germar, 6th March 1932 1932, Letter from the Secretary of Lloyd's Register to Bremen Surveyors following up on form of undertaking by Owners required by Committee in this case for Germar, 9th September 1932 1932, Letter from the Secretary of Lloyd's Register to 'Globus' Rhederei A G, Owners, informing of works to complete 2nd S S No 2, vessel being laid up & enclosing form of undertaking for class to remain undisturbed in Register Book for Germar, 23rd August 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, year of grace expired 4,32 & submitting case for consideration of Committee for Germar, 19th August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 15th August 1932 1932, Memo to the Chief Ship & Engineer Surveyors regarding 2nd S S No 2 Survey Partly Held, vessel laid up but suddenly placed in commission with survey to be carried out on return, submitting case for consideration of Committee for Germar, 28th May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Survey for Germar, 23rd May 1932 1932, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd S S No 2 Partly Held, works to complete, submitting action be deferred for Germar, 3rd May 1932 1932, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 27th April 1932 1932, Question & Answer Memo between London & Bremen Office regarding Special Survey for Germar, 14th March 1932 1932, Copy of letter from Secretary of Lloyd's Register to Principal Clerk of Lloyd's regarding laid up vessels with Owners requested to furnish approved letter of guarantee for overdue 2nd S S No 2 partly held for Germar, 23rd August 1932 1932, Question & Answer Memo between London & Bremen Office regarding Demolition of Germar, 25th July 1933 1933, Report of Total Loss, Casualty, &c for Germar, 25th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register to Principal Clerk of Lloyd's regarding deletion from list of vessels laid up under an undertaking with Record To be broken up for Germar, 24th March 1933 1933, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Bremen Report on 2nd No 2 Survey Partly Held, laid up & undertaking furnished by Owners, to be broken up, submitting action be deferred for Germar, 21st March 1933 1933, Copy of letter from A H A Carstensen, Bremen Surveyor, to the Secretary of Lloyd's Register informing of ownership & to be broken up in the course of this year of Germar, 15th March 1933 1933, Question & Answer Memo between London & Bremen Office regarding Germar still being Laid Up, 7th March 1933 1933, Letter from Clerk to the Classification Committee of Lloyd's Register, London, to Bremen Surveyors advising of sale to Russia & requesting intentions of new Owners regarding overdue surveys for Germar, 10th March 1933 1933, Copy of Question & Answer Memo between London & Bremen Office regarding overdue screwshaft survey & laid up Germar, 7th March 1933 1933 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Location of construction for a vessel’s engines.