Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Predominant material(s) utilised in a vessel’s construction.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Vessel’s area of loss or disposal/last known recorded location.

The process of transferring a vessel to water, but not necessarily her completion.

Unique identifier for a given ship, it is assigned by a builder.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Is electric lighting fitted to the vessel?

Contextual information related to the reasons of the vessel’s loss or disposal.

Recorded date for the vessel’s loss or disposal.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.