Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/02/1943
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Burrard Dry Dock Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
North Vancouver, BC
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5882
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
23/02/1943
Name of the individual/entity/organisation responsible for authoring the record
W E Baillie
Location where a vessel’s survey was undertaken.
North Vancouver, BC
Date of the meeting of the Classing Committee.
16/04/1943
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7122
Location of construction for a vessel’s engines.
Montreal P Q
Dominion Engineering Works
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
Indian Ocean
Physical extent of a record.
1
Name of ship as recorded on the record
Fort Buckingham
The process of transferring a vessel to water, but not necessarily her completion.
13/01/1943
Unique identifier for a given ship, it is assigned by a builder.
169
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Vcr
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
The date of first visit by a surveyor.
22/01/1943
The individual and/or organisation listed
Minister of Munitions & Supply of Canada
Location where the document is written.
Vancouver, BC
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 2,43 FD CL
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Superheat to 575 F
Date in which construction of a vessel’s engines were completed.
1942
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
01/02/1944
Pertinent, useful or interesting recorded content.
Also refers to vessel Fort Saint James
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.