Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Valerian Kuibeshev ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912 )

Elbruz ( Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/02/1914 ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

189 ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Willington Quay on Tyne ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912 )

Amsterdam ( Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914 )

Middlesbrough ( Request for Special Survey for Elbruz, 13th February 1913 1913 )

Stockton on Tees; Middlesbrough ( Report on Boilers for Elbruz, 29th October 1913 1913 )

Stockton on Tees ( Plan of Steel Boiler for Elbruz, 1913 1913 )

Antwerp ( Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919 )

London ( Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Newcastle on Tyne ( Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914 )

Willington Quay; Newcastle on Tyne ( Steel Steamer Report for Elbruz, 1st April 1914 1914 )

A vessel’s means of propulsion.

Propulsion

Steam ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919 )

undefined ( Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Motor (internal combustion) ( Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Draft

1912 ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912 )

1913 ( Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913 )

1914 ( Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914 )

1915 ( Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915 )

1916 ( Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916 )

1917 ( Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917 )

1918 ( Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918 )

1919 ( Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919 )

1930 ( Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930 )

1931 ( Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931 )

0000 ( Report of Survey for Repairs, &c for Elbruz, Undated no date )

Recorded information related to a vessel’s movements.

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Twin Single Acting Four Cycle Werkspoor Diesel Engines ( Report on Machinery for Elbruz, 18th July 1914 1914 )

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1914 ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Tyne Iron Shipbuilding Co Ltd ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Willington Quay ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tanker ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912 )

undefined ( Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Twin Screw Motor Vessel ( Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Memo regarding Classification of Elbruz, 1st January 1931 1931 )

Twin Screw Steamer ( Steel Steamer Report for Elbruz, 1st April 1914 1914, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912, Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912, Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913, Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913, Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919, Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930, Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931, Report of Survey for Repairs, &c for Elbruz, Undated no date )

A vessel’s calculated maximum speed.

Speed (knots)

r 1912 ( Profile & Deck Plans for Valerian Kuibeshev, 5th November 1912 1912, Half Midship Section Plan for Elbruz, 5th November 1912 1912 )

, 1912 ( Plan in German Language of Crankshafting for Elbruz, 1912 1912, Plan in German Language of Tunnel, Thrust & Screwshafting for Elbruz, 1912 1912 )

1913 ( Request for Special Survey for Elbruz, 13th February 1913 1913, Report on Boilers for Elbruz, 29th October 1913 1913 )

, 1913 ( Plan of Steam Boiler for Elbruz, 1913 1913, Plan of Steel Boiler for Elbruz, 1913 1913 )

1914 ( Memo for the Chief Engineer Surveyor with their annotations regarding Elbruz, 13th October 1914 1914, Copy of a letter from the Antwerp Surveyors regarding Elbruz, 5th October 1914 1914, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 23rd September 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elbruz, 21st July 1914 1914, Letter from Alexander Munro, Newcastle Surveyor, to The Secretary of Lloyd\'s Register, London, regarding particulars of tonnage for Elbruz, 4th July 1914 1914, Letter from Alexander Munro, to The Secretary, London, regarding Elbruz, 20th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Amsterdam, regarding Elbruz, 17th April 1914 1914, Copy of Letter from Secretary, to The Surveyors, Newcastle upon Tyne, regarding Elbruz, 17th April 1914 1914, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elbruz, 17th April 1914 1914, Steel Steamer Report for Elbruz, 1st April 1914 1914, Report of Survey for Repairs, &c for Elbruz, 20th July 1914 1914, Memo regarding classification for Elbruz, 22nd July 1914 1914, Report on Machinery for Elbruz, 18th July 1914 1914, Report on Boilers for Elbruz, 8th April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Elbruz, 8th April 1914 1914 )

bruz ( Extract from Letter dated 1st October 1914 from Society's Surveyors at Antwerp, regarding Elbruz 1914 )

1915 ( Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 23rd September 1915 1915, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 30th April 1915 1915 )

1916 ( Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit for Elbruz, 19th December 1916 1916, Memo for the Chief Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 14th June 1916 1916, Memo for the Chief Engineer Surveyors with their annotations regarding Limit Three New air vessels to fit for Elbruz, 12th February 1916 1916 )

1917 ( Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 3rd October 1917 1917, Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 4th April 1917 1917 )

1918 ( Memo for the Chief Engineer Surveyor with their annotations regarding Limit Three New air vessels to fit expired 8,14 for Elbruz, 9th January 1918 1918 )

1919 ( Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 25th November 1919 1919, Letter from G O Herbert, per The Surveyors, to The Secretary, London, regarding Elbruz, 17th November 1919 1919, Copy of Letter from Secretary, to The Surveyors, Antwerp, regarding Elbruz, 14th November 1919 1919 )

1930 ( Memo regarding withdrawal of class for Elbruz, 29th December 1930 1930, Letter from R W S Irving, Transport Department, Russian Oil Products Ltd, to Lloyds Register, London, regarding Elbruz, 22nd December 1930 1930 )

1931 ( Copy of Letter from pro Secretary, to Russian Oil Products Ltd, London, regarding Elbruz, 1st January 1931 1931, Memo regarding Classification of Elbruz, 1st January 1931 1931 )

ated ( Report of Survey for Repairs, &c for Elbruz, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The name of the port/place of destination given.

Recorded information relating the specific cargo being conveyed.

Location of construction for a vessel’s engines.

Location of engine build

Amsterdam ( Report on Machinery for Elbruz, 18th July 1914 1914 )

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.