Name of ship as recorded on the record
Ballydorn ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
Clandeboye ( Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of Freeboard Report for Clandeboye, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
08/05/1913 ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
244 ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Location where a vessel’s survey was undertaken.
Bowling Glasgow ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912 )
Glasgow ( Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Report on Boilers for Clandeboye, 19th April 1913 1913 )
Bowling; Glasgow ( Steel Steamer Report for Clandeboye, 30th May 1913 1913 )
Clydebank; Glasgow ( Report on Machinery for Clandeboye, 29th May 1913 1913 )
Belfast ( Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941 )
Llanelly; Swansea ( Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933 )
London; Barrow ( Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959 )
Manchester ( Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
The official record pronounced by the Committee
To be broken up ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Barrow ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
The listed port to which a given vessel belongs.
Belfast ( Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Bowling; Belfast ( Steel Steamer Report for Clandeboye, 30th May 1913 1913 )
Physical arrangement of a ship’s masts, sails and rigging.
Name of surveyor.
Harry Clarke ( Report on Machinery for Clandeboye, 29th May 1913 1913 )
William Gordon Minchin ( Report on Boilers for Clandeboye, 19th April 1913 1913 )
Location of construction for a vessel’s engines.
Clydebank ( Report on Machinery for Clandeboye, 29th May 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913 )
Glasgow ( Report on Boilers for Clandeboye, 19th April 1913 1913 )
The port in which a vessel is registered or permanently based.
Belfast ( Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
The year in which a vessel’s construction is completed.
1913 ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Scott & Sons ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Bowling ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Is the steamer assisted by sail?
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Barrow ( Midship Section Plan for Ballydorn, 14th October 1912 1912, Profile & Decks Plan for Clandeboye, 14th October 1912 1912, Request for Special Survey of Boiler for Clandeboye, 28th November 1912 1912, Memo to the Chief Ship Surveyor regarding First Entry Survey & classification for Clandeboye, 4th June 1913 1913, Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report C.11 Continued, Memorandum of alterations since ship surveyed for assignment of load lines for Clandeboye, December 1941 1941, Copy of a letter from the Deputy Clerk to the Classification Committee to the Barrow Surveyors regarding Ballydorn, 23rd June 1959 1959, Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of Freeboard Report for Clandeboye, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913 )
Sws ( Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933 )
Mch ( Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
The individual and/or organisation listed
John Kelly Ltd ( Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Report on Boilers for Clandeboye, 19th April 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; 5,13; Lloyd's A & CP; +LMC 5,13 ( Steel Steamer Report for Clandeboye, 30th May 1913 1913 )
+LMC 5,13 ( Report on Machinery for Clandeboye, 29th May 1913 1913 )
See Minute on Gls Rpt No 32770 ( Report on Boilers for Clandeboye, 19th April 1913 1913 )
+100A1; S S Bel No 3-6,26; S S Bel No 1-31 ( Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933 )
+100A1 9,58; S S (Dr) 1,48; Irv 7,57; +LMC 7,57; BS M 10,58; Sp 7,57; TS 5,57; CL ( Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959 )
See Committee Minute ( Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
Deferred await Liv report ( Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
The name of the port/place of destination given.
Belfast ( Steel Steamer Report for Clandeboye, 30th May 1913 1913 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
614 ( Steel Steamer Report for Clandeboye, 30th May 1913 1913, Report on Machinery for Clandeboye, 29th May 1913 1913, Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913, Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933 )
648 ( Question & Answer Memo between London & Barrow Offices regarding the breaking up of Ballydorn, 10th June 1959 1959, Report of Total Loss, Casualty, &c for Ballydorn, 17th June 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Copy of a Certificate of Survey of Damage & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Clandeboye, 29th May 1913 1913 )
Reciprocating Triple Expansion Direct Acting Vertical Inverted Cylinder ( Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913 )
Date in which construction of a vessel’s engines were completed.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Samuel Kelly ( Form for Vessels of 100 Tons & Upwards for Clandeboye, 29th May 1913 1913 )
W Clint ( Report of Surveys for Freeboard for Clandeboye, 10th February 1933 1933 )
E W P King ( Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959, Report of Ship Surveys & Repairs for Ballydorn, 11th May 1959 1959 )