Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/05/1913
The year in which a vessel’s construction is completed.
1913
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Scott & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Bowling
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
32770
The listed port to which a given vessel belongs.
Belfast
The date of first visit by a surveyor.
09/12/1912
The individual and/or organisation listed
John Kelly Ltd
Name of the individual/entity/organisation responsible for authoring the record
Harry Clarke
Name of surveyor.
Harry Clarke
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 5,13
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1913
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Barrow
Name of ship as recorded on the record
Clandeboye
The process of transferring a vessel to water, but not necessarily her completion.
08/05/1913
Unique identifier for a given ship, it is assigned by a builder.
244
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
29/05/1913
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Clint
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Clydebank
Date of the meeting of the Classing Committee.
03/06/1913
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
614
Location of construction for a vessel’s engines.
Clydebank
Aitchison Blair Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Barrow
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.