Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Pontwen ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Maindy Grange ( Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932 )
Aris ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940 )
Mount Pindus ( Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
28/04/1914 ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
639 ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
The individual and/or organisation listed
Richardson Duck & Co Ltd ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913 )
W & C J Jones Steam Ship Co Ltd ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
Sir David R Llewellyn Bart ( Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930 )
Tramp Shipping Development Co Ltd ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932 )
The Tramp Shipping Development Co Ltd ( Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932 )
N Kulukundi ( Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932 )
Michael M Xylas ( Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
The official record pronounced by the Committee
Sunk (war loss) ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Location where a vessel’s survey was undertaken.
Stockton on Tees ( Plan of Steel Boiler for Pontwen, 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914 )
Newcastle on Tyne; Stockton on Tees ( Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913 )
Newcastle on Tyne; Stockton ( Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914 )
Stockton; Middlesbrough ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
Stockton on Tees; Middlesbrough ( Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914 )
Middlesbrough ( Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
London ( Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940 )
Glasgow ( Ship Forgings Form for Pontwen, 18th March 1914 1914 )
Newcastle ( Engine Forgings Form for Pontwen, 1914 1914 )
Sunderland ( Ship Castings Form for Pontwen, 17th February 1914 1914 )
Leeds; Stockton on Tees ( Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914 )
Liverpool ( Certificate of Survey for Pontwen, 19th March 1914 1914 )
Swansea ( Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930 )
Newport Mon ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932 )
Genoa ( Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date )
Troon; Glasgow ( Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
H E Dalton ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
Recorded information related to a vessel’s movements.
Stockholm; Bristol Channel ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
Name of surveyor.
William Morrison ( Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914 )
Alexander Fletcher ( Ship Forgings Form for Pontwen, 18th March 1914 1914 )
William Campbell; William Morrison ( Engine Forgings Form for Pontwen, 1914 1914 )
M Robertson ( Ship Castings Form for Pontwen, 17th February 1914 1914 )
William Sibun; John Dykes ( Certificate of Survey for Pontwen, 19th March 1914 1914 )
Location of construction for a vessel’s engines.
Stockton ( Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939 )
Stockton on Tees ( Engine Forgings Form for Pontwen, 1914 1914 )
The port in which a vessel is registered or permanently based.
Piraeus ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932 )
Panama ( Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date )
Cardiff ( Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
The year in which a vessel’s construction is completed.
1914 ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richardson, Duck & Co Ltd ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton-on-Tees ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
A vessel’s means of propulsion.
undefined ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date )
Steam ( Plan of Steel Boiler for Pontwen, 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Is the steamer assisted by sail?
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Gunfire ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Recorded date for the vessel’s loss or disposal.
12/10/1939 ( Request for Special Survey of Boilers of Pontwen, 26th May 1913 1913, Plan of Steel Boiler for Pontwen, 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th November 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 13th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 27th October 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 11th November 1913 1913, Plan of 3 Main Boilers for Pontwen, 24th September 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 4th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 6th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 12th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 9th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 10th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 17th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 15th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 24th December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 22nd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 23rd December 1913 1913, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 31st December 1913 1913, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Pontwen, 9th June 1914 1914, Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Freeboard Verification Form for Steamers for Pontwen, 26th May 1914 1914, Letter from R H Martell, for the Middlesbrough Surveyors, to the Secretary for Lloyd's Register, London, returning freeboard certificates for Pontwen, with reference to correct official number, 29th May 1914 1914, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors regarding amended freeboard certificates for Pontwen, 30th May 1914 1914, Memo from Freeboard Report regarding approval of freeboards for Pontwen, 13th May 1914 1914, Freeboard Application for Certificate of Approval for Pontwen, 9th May 1914 1914, Tracing of Tonnage Displacement Scale for Pontwen, 9th May 1914 1914, Longitudinal Section & Deck Plans for Pontwen, 5th June 1914 1914, Plan of Midship Section for Pontwen, 4th June 1914 1914, Ship Forgings Form for Pontwen, 18th March 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 16th February 1914 1914, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Pontwen, 19th February 1914 1914, Engine Forgings Form for Pontwen, 1914 1914, Ship Castings Form for Pontwen, 17th February 1914 1914, Surveyor’s Copy of Receipt for four Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 13th January 1914 1914, Surveyor’s Copy of Receipt for five Deighton corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Pontwen, 16th January 1914 1914, Certificate of Survey for Pontwen, 19th March 1914 1914, Freeboard Verification Form for Steamers for Maindy Grange, 26th March 1930 1930, Letter from the Secretary for Lloyd's Register, London, to the Swansea Surveyors acknowledging receipt of a letter returning old freeboard certificate for Maindy Grange, 29th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding old Freeboard Certificate for Maindy Grange, 28th March 1930 1930, Letter from Hamish McG Paton, for the Swansea Surveyors, to the Secretary for Lloyd's Register, London, forwarding verification of freeboard markings form for Maindy Grange, 26th March 1930 1930, Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Freeboard Verification Form for Ordinary Cargo Ships for Mount Pindus, 25th October 1932 1932, Freeboard Verification Form for Steamers for Mount Pindus, 24th August 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors acknowledging receipt of a letter, with enclosed verification marking form, for Mount Pindus, 31st October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, enclosing freeboard verification form for Mount Pindus, & stating conditions of assignment complied with on Special Survey No 1, 27th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Genoa Surveyors enclosing a copy of the freeboard assignment letter & Convention freeboard certificate for Mount Pindus, 17th October 1932 1932, Letter from Cyril A Townshend, for the Genoa Surveyors, to the Secretary for Lloyd's Register, London, regarding Special Survey & freeboard assignment for Mount Pindus, 14th October 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Cardiff Surveyors acknowledging receipt of old freeboard certificate for Maindy Grange, 14th September 1932 1932, Letter from George H Macadam, for the Cardiff Surveyors, to the Secretary for Lloyd's Register, London, forwarding certificate of freeboard for Maindy Grange, 13th September 1932 1932, Memo from Freeboard Report regarding approval of freeboards for Mount Pindus, subject to conditions, 26th August 1932 1932, Freeboard Application for Certificate of Approval for Mount Pindus, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Letter from John B A Common, for the Newport Surveyors, to the Secretary for Lloyd's Register, London, requesting particulars extracted from the original freeboard report for Maindy Grange, 19th August 1932 1932, Letter from Robert G Knox, for the Piraeus Surveyors, to the Secretary for Lloyd's Register, London, regarding the attempted forwarding of documents relating to Aris, 9th December 1939 1939, Letter from the Clerk to the Classification Committee, London, to Michael M Xylas Esq, Piraeus, regarding the sinking of Aris, & the recording of this in the Register Book, 10th November 1939 1939, Memo fo the Chief Ship Surveyor with their annotations regarding docking survey for Aris, with reference to coamings, 20th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Memo to Nettleton regarding the sinking of Aris, 20th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940, Letter from G James, Director of S Livanos & Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, regarding the sinking of Aris, & the recording of this in the Register Book, 6th January 1940 1940, Letter from the Clerk to the Classification Committee, Wokingham, to Michael M Xylas Esq, S Livanos & Co Ltd, London, regarding the sinking of Aris, & the recording of this in the Register Book, 3rd January 1940 1940, Memo from Freeboard Report regarding the sinking of Aris, 9th January 1940 1940, Freeboard Verification Form for Ordinary Cargo &/or Passenger Ships for Mount Pindus, Undated no date, Particulars for Freeboard Certificates for Mount Pindus, Undated no date, Freeboard & Draught Document for Mount Pindus, Undated no date, Freeboard & Draught Document for Pontwen, Undated no date, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Steel Steamer Report for Pontwen, 5th June 1914 1914, Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
Npt ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932 )
Gls ( Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W & C Jones ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; +LMC 6,14 ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
+LMC 6,14 ( Report on Machinery for Pontwen, 5th June 1914 1914 )
See Minute on Fe Attched ( Report on Boilers for Pontwen, 3rd April 1914 1914 )
+100A1; SS No3 12,27 ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932 )
+100A1 ( Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932 )
+100A1 7,38; S S CFF No 3-12,27; S S Rov No 2-35; +LMC 8,36; B S 1,39; TS CL 6,38 ( Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939 )
+100A1 10,39; S S No 3-12,27; S S No 2-35; +LMC 8,36; B S 1,39; TS 6,38 CL ( Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940 )
+100A1 Contemplated ( Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
The name of the port/place of destination given.
Bristol Channel ( Steel Steamer Report for Pontwen, 5th June 1914 1914 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4796 ( Steel Steamer Report for Pontwen, 5th June 1914 1914, Report of Surveys for Freeboard-Steam Ships for Pontwen, Undated no date )
4810 ( Report of Surveys for Freeboard for Aris, 24th August 1932 1932, Report of Surveys for Freeboard-Steam Ships for Mount Pindus, 24th August 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Total Loss, Casualty, &c for Aris, 8th January 1940 1940 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound ( Report on Machinery for Pontwen, 5th June 1914 1914 )
Date in which construction of a vessel’s engines were completed.
1914 ( Report on Machinery for Pontwen, 5th June 1914 1914, Report on Boilers for Pontwen, 3rd April 1914 1914, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Aris, 9th October 1939 1939 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.