Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Adaptity ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The process of transferring a vessel to water, but not necessarily her completion.
06/02/1935 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Unique identifier for a given ship, it is assigned by a builder.
337 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Screw Motor Vessel ( Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Does the vessel possess an auxiliary power source?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Is electric lighting fitted to the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by mine ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Location where a vessel’s survey was undertaken.
London ( Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936 )
Hull ( Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935 )
Yarmouth; Ipswich ( Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935 )
Goole; Hull ( Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935 )
Greenhithe; London ( Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Newbury; London ( Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935 )
Great Yarmouth ( Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ips ( Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935 )
Hul ( Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935 )
Lon ( Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Cargo battens Not Fitted; Lloyds A & Cp; +LMC 10,35; Oil Engines; OG ( Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935 )
See Lon FE Rpt 102330 ( Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935 )
See Lon FE 102330 ( Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935 )
+LMC 10,35; Oil Eng; OG ( Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935 )
+100A1 12,35; Oil Engine; +LMC 10,35; +LMC (M) 12,38; TS OG 12,38 ( Report of Total Loss, Casualty, &c for Adaptity, Undated 1940 )
+100A1 Subject; S 8,10; Cargo battens not fitted; S S 1-40; +LMC 8,40 ( Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940 )
+LMC 8,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The port in which a vessel is registered or permanently based.
Type and configuration of the engine(s) supplied for a vessel.
Internal Combustion Diesel ( Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935 )
Oil Engine 2SCSA ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935 )
Airless Injection Boasted ( Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935 )
Airless Injection ( Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935 )
Date in which construction of a vessel’s engines were completed.
1935 ( Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935 )
The year in which a vessel’s construction is completed.
1925 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Fellows & Co Ltd ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The port or place in which the vessel’s construction took place, at the time of writing.
Yarmouth ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
A vessel’s means of propulsion.
Motor (internal combustion) ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Steam ( Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935 )
Is the steamer assisted by sail?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Is machinery fitted at the aft of the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Vessel’s place of loss or disposal/last known recorded location.
South East Coast ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Recorded date for the vessel’s loss or disposal.
05/10/1940 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Adaptity, 30th December 1935 1935, Letter from Secretary of Lloyd\'s Register to The Surveyors, Lloyd\'s Register, London, regarding raised engine casing for Adaptity, 21st December 1935 1935, Letter from H A Garnett, Surveyor, Lloyd\'s Register, London to The Secretary of Lloyds Register, regarding raised engine casing for Adaptity, 20th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening under survey & building fees for Adaptity, 11th December 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Y Bell, Surveyor, Lloyd\'s Register, Ipswich, regarding lengthening under survey & completion of Adaptity, 25th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding report on lengthening of Adaptity, 21st June 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to The Surveyors, Lloyd\'s Register, Hull, regarding lengthening, machinery fitting & fees for Adaptity, 20th June 1935 1935, Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935, Letter from W Malcolm, per The Surveyors, Lloyd\'s Register, Hull to The Secretary of Lloyds Register, regarding lengthening, approved plans & fees for Adaptity, 18th June 1935 1935, Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the engines & machinery for Adaptity, 30th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935, Letter from Secretary of Lloyd\'s Register to The Newbury Diesel Co Ltd, Newbury regarding fees & expenses related to engine survey for Adaptity, 8th April 1936 1936, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Memo regarding omission of electric installation testing from report for Adaptity, 16th Octobe 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding permanent repairs & the 1st SS No 1 for Adaptity, 7th October 1940 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the Special Survey of Engines & Boilers for SS No 1 for Adaptity, 9th October 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
301 ( Memo regarding lengthening, installation of machinery & completion of Adaptity, 19th June 1935 1935 )
372 ( Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The individual and/or organisation listed
F T Everard & Sons Ltd ( Steel Steamer or Motorship Report for Adaptity, 12th September 1935 1935, Steel Steamer or Motorship Report for Adaptity, 18th June 1935 1935, Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report of Total Loss, Casualty, &c for Adaptity, Undated 1940, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
F T Everard & Sons ( Report on Electrical Equipment for Adaptity, 4th November 1935 1935 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
MKMJ ( Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
William Joseph Everard ( Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935 )
Location of construction for a vessel’s engines.
Newbury ( Form for Vessels of 100 Tons & Upwards for Adaptity, 21st October 1935 1935, Report on Oil Engine Machinery for Adaptity, 21st October 1935 1935, Report on Oil Engine Electric Generator Pumping & Compressor Sets for Adaptity, 27th October 1935 1935, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
The listed port to which a given vessel belongs.
London ( Report of Survey for Repairs, &c for Adaptity, 20th December 1935 1935, Report on Electrical Equipment for Adaptity, 4th November 1935 1935, Report of Survey for Repairs, &c for Adaptity, 17th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Adaptity, 17th September 1940 1940 )
Has the vessel been converted/rebuilt/lengthened?
Lengthening ( Plan of Proposed Lengthening for Adaptity,1935 1935, Proposed Lengthening Plan for Adaptity, 1935 1935 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.