Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/09/1852
The year in which a vessel’s construction is completed.
1852
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Oliver
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Wex
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Gregory Cahill
Location where the document is written.
Wexford
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Raised to 5A1
Recorded information related to a vessel’s movements.
Wexford; Cardiff
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Forth
The process of transferring a vessel to water, but not necessarily her completion.
__/06/1852
The port or place in which the vessel’s construction took place, at the time of writing.
St Johns, New Brunswick
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
201
The listed port to which a given vessel belongs.
Wexford
The individual and/or organisation listed
R M & R Allen
Name of the individual/entity/organisation responsible for authoring the record
Mark Devereux
Location where a vessel’s survey was undertaken.
Wexford
Date of the meeting of the Classing Committee.
28/09/0000
The name of the port/place of destination given.
Cardiff
Physical arrangement of a ship’s masts, sails and rigging.
Bg - Brig
Predominant material(s) utilised in a vessel’s construction.
Wood
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
200
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.