Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/12/1920
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cantiere San Rocco
Unique identifier for a given ship, it is assigned by a builder.
35
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Tri
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
11/11/1920
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
O Olivetti
Location where the document is written.
Trieste
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel Shelter Dk Subject With Freeboard Referred to E C as to date of Fuel
Recorded information related to a vessel’s movements.
Trieste; Australia
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Stranded
Vessel’s place of loss or disposal/last known recorded location.
Durban
Recorded date for the vessel’s loss or disposal.
11/06/1940
Name of ship as recorded on the record
Timavo
The process of transferring a vessel to water, but not necessarily her completion.
15/12/1917
Name of the shipbuilder as it appears on the record.
Versa
The port or place in which the vessel’s construction took place, at the time of writing.
Trieste
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4910
The listed port to which a given vessel belongs.
Trieste
The date of first visit by a surveyor.
04/07/1914
The individual and/or organisation listed
Navigazione Libera Triestina
Name of the individual/entity/organisation responsible for authoring the record
Horland
Location where a vessel’s survey was undertaken.
Trieste
Date of the meeting of the Classing Committee.
29/04/1921
The name of the port/place of destination given.
Australia
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7434
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Beached herself & Broke her back
The country or national waters where a vessel is lost/disposed of, or last recorded.
South Africa
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.