Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/03/1902
The year in which a vessel’s construction is completed.
1901
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co
Unique identifier for a given ship, it is assigned by a builder.
182
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Lighting Installation
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
03/03/1902
Name of the individual/entity/organisation responsible for authoring the record
R J Beveridge
Location where a vessel’s survey was undertaken.
Belfast
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Oswestry Grange
The process of transferring a vessel to water, but not necessarily her completion.
23/01/1902
Name of the shipbuilder as it appears on the record.
Wm Strachan
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5408
The listed port to which a given vessel belongs.
Greenock
The date of first visit by a surveyor.
23/01/1902
The individual and/or organisation listed
Oswestry Grange Steam Ship Co Ltd
Location where the document is written.
Belfast
Date of the meeting of the Classing Committee.
17/10/1902
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.