Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/07/1908
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richardson, Duck & Co
Unique identifier for a given ship, it is assigned by a builder.
589
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Iron or Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
08/07/1908
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Haldinstein & Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
W H Cooper
Name of surveyor.
W H Cooper
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyd\'s A&CP; +LMC 7,08
Recorded information related to a vessel’s movements.
Stockton; Port Said; Cardiff
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
y 1908
Contextual information related to the reasons of the vessel’s loss or disposal.
Laid up & resold for breaking up; May be sold again
1908
Pertinent, useful or interesting recorded content.
Title of document has been altered; Also refers to vessel Barrington Court
Name of ship as recorded on the record
Cressington Court
The process of transferring a vessel to water, but not necessarily her completion.
13/06/1908
Name of the shipbuilder as it appears on the record.
Richardson Duck & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5511
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
12/08/1907
The individual and/or organisation listed
Cressington Steam Ship Co Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J W Gleghorn
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Stockton
Date of the meeting of the Classing Committee.
21/07/1908
The name of the port/place of destination given.
Port Said; Cardiff
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4396
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
To be broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.