Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/12/1905
The year in which a vessel’s construction is completed.
1905
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ropner & Son
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
The port in which a vessel is registered or permanently based.
West Hartlepool
The individual and/or organisation listed
Pool Shipping Co Ltd
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4577
Location of construction for a vessel’s engines.
Stockton
Blair & Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Physical extent of a record.
1
Name of ship as recorded on the record
Teespool
The process of transferring a vessel to water, but not necessarily her completion.
27/11/1905
Unique identifier for a given ship, it is assigned by a builder.
422
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
West Hartlepool
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1905
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1905
Contextual information related to the reasons of the vessel’s loss or disposal.
Broken Up
1905
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.