Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

27/12/1905

The year in which a vessel’s construction is completed.

Year of ship completion

1905

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Ropner & Son

Unique identifier for a given ship, it is assigned by a builder.

Yard no

422

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Mdb

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Iron or Steel Steamer

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

18/12/1905

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

R Ropner & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

Henry C T Ireland

Location where a vessel’s survey was undertaken.

Location of Survey

Stockton on Tees

Date of the meeting of the Classing Committee.

Date of Classing committee

29/12/1905

The name of the port/place of destination given.

Destined voyage

Baltimore

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Sr - Schooner

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1905

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Broken Up

Draft

1905

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of document has been altered

Name of ship as recorded on the record

Ship name

Teespool

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

27/11/1905

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

J W Smith

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Stockton

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

4376

The listed port to which a given vessel belongs.

Port belonging to

West Hartlepool

The date of first visit by a surveyor.

Date of first survey

13/07/1905

The individual and/or organisation listed

Ship owner

Pool Shipping Co Ltd

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

James Henry Pearson

Location where the document is written.

Location of Document Creation

Middlesbrough

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Trunk Dk No Sheer; Lloyds A & CP; +LMC 12,05

Recorded information related to a vessel’s movements.

Voyage information

Stockton on Tees; Baltimore

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

A vessel’s means of propulsion.

Propulsion

Steam

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

4577

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Physical extent of a record.

Number of parts

2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.