Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/02/1933
The year in which a vessel’s construction is completed.
1915
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Aktiebolaget Lodose Varf
The port or place in which the vessel’s construction took place, at the time of writing.
Lodose
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
89790
Additional numbers that feature on a given record that may be used for identification.
24411
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
F C Cocks
Location where a vessel’s survey was undertaken.
Newcastle on Tyne
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Physical extent of a record.
1
Name of ship as recorded on the record
Engineer
The process of transferring a vessel to water, but not necessarily her completion.
19/08/1915
Unique identifier for a given ship, it is assigned by a builder.
35
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
The port in which a vessel is registered or permanently based.
Newcastle
The individual and/or organisation listed
T Steam Coaster Ltd
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; SS Shl No 3-2,29
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
317
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Laid up, to be broken up
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.