Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/08/1927
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bremer Vulkan
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Rot
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
24/08/1927
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Jugoslovenska Amerikanska Plovidba
Location where the document is written.
Rotterdam
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Rpt; Rot 16722
Recorded information related to a vessel’s movements.
Schiedam; Cardiff
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Believed Torpedoed & Sunk
Physical extent of a record.
1
Name of ship as recorded on the record
Preradovic
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1907
The port or place in which the vessel’s construction took place, at the time of writing.
Vegesack
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
16722a
The listed port to which a given vessel belongs.
Spalato / Split
The date of first visit by a surveyor.
29/07/1927
The individual and/or organisation listed
Jugoslovenska Amerikanska Plovidba
Name of the individual/entity/organisation responsible for authoring the record
M P Jonker
Location where a vessel’s survey was undertaken.
Schiedam
Date of the meeting of the Classing Committee.
10/11/1931
The name of the port/place of destination given.
Cardiff
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5341
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded date for the vessel’s loss or disposal.
12/08/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.