Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/07/1914
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Harkess & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
135597
The port in which a vessel is registered or permanently based.
Liverpool
The individual and/or organisation listed
Ellerman Lines Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Alfred Singleton
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Inverted Direct Acting
Date in which construction of a vessel’s engines were completed.
1914
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Bombed & Sunk
The country or national waters where a vessel is lost/disposed of, or last recorded.
Portugal
Physical extent of a record.
1
Name of ship as recorded on the record
Falernian
The process of transferring a vessel to water, but not necessarily her completion.
25/05/1914
Unique identifier for a given ship, it is assigned by a builder.
204
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JFVK
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Fred Swift
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3419
Location of construction for a vessel’s engines.
Middlesbrough
Richardsons Westgarth Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s place of loss or disposal/last known recorded location.
Coast of Portugal
Recorded date for the vessel’s loss or disposal.
24/06/1943
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.