Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/01/1917
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Wood, Skinner & Co Ltd
The name of the yard where the vessel was built.
Bill Quay
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5b Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
30/06/1916
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Darlington
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded on Haisbro Sand
Recorded date for the vessel’s loss or disposal.
06/08/1941
Name of ship as recorded on the record
Tynemouth
The process of transferring a vessel to water, but not necessarily her completion.
16/08/1916
Unique identifier for a given ship, it is assigned by a builder.
197
The port or place in which the vessel’s construction took place, at the time of writing.
Bill Quay on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
9407
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 69559
The date of first visit by a surveyor.
12/03/1915
Name of the individual/entity/organisation responsible for authoring the record
J Kerr; Thomas Field
Name of surveyor.
Thomas Field
Date of the meeting of the Classing Committee.
06/02/1917
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Stranded
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.