Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

14/06/1918

The year in which a vessel’s construction is completed.

Year of ship completion

1918

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Dunlop Bremner & Co Ltd

Unique identifier for a given ship, it is assigned by a builder.

Yard no

289

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Grk

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Steel Steamer

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

09/06/1918

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Blue Star Line Ltd

Name of the individual/entity/organisation responsible for authoring the record

Document author

Robert Dunsmuir

Name of surveyor.

Surveyor

Robert Dunsmuir

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Awning Dk With Fbd 6,18; Subject Lloyd's A & CP; +LMC 6,18; FD

Physical arrangement of a ship’s masts, sails and rigging.

Rig

FA - Fore & Aft

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5561

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Torpedoed & Presumed Sunk

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

02/04/1943

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to vessel Rubiera

Name of ship as recorded on the record

Ship name

Camana

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/12/1917

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Geo G Parker

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

17314

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

13/04/1916

The individual and/or organisation listed

Ship owner

The Camana Steamship Co Ltd

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

J Fisher

Location where the document is written.

Location of Document Creation

Greenock

Location where a vessel’s survey was undertaken.

Location of Survey

Port Glasgow

Date of the meeting of the Classing Committee.

Date of Classing committee

06/01/1920

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Torpedoed and Sunk

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

South Atlantic

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.