Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/02/1951
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Chambers Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Lowestoft
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
57125
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Nantes 178
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/02/1951
Name of the individual/entity/organisation responsible for authoring the record
W Henderson; C H Stocks
Location where a vessel’s survey was undertaken.
Newport Mon
Date of the meeting of the Classing Committee.
21/03/1951
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1951
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up Purposes, Demolition commenced
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
1951
Name of ship as recorded on the record
Marianthe
The process of transferring a vessel to water, but not necessarily her completion.
31/07/1920
Unique identifier for a given ship, it is assigned by a builder.
503
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cff
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
07/02/1951
The individual and/or organisation listed
A G Tsavlivis Ltd
Location where the document is written.
Cardiff
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; 10,50; SS Bry 3,48,Dr; +LMC 11,46; BS 6,50; TS, 66, 11,49; Cargo battens not Fitted
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
700
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Grays Essex
Recorded date for the vessel’s loss or disposal.
__/__/0000
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.