Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/01/1884
The year in which a vessel’s construction is completed.
1883
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
S P Austin & Son
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13350
Additional numbers that feature on a given record that may be used for identification.
Hartlepool 5400
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
22/01/1884
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J H Rutherford
Location where the document is written.
Sunderland
Location where a vessel’s survey was undertaken.
Stockton
Date of the meeting of the Classing Committee.
05/02/1884
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Surface Condensing
Date in which construction of a vessel’s engines were completed.
1883
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
On passage from Nordenham to Shields, she ran aground in dense fog. She struck at low water, about 11 p.m. and was holed badly. Robin Hood?s Bay and Whitby lifeboats took the crew off. Information from www.wrecksite.eu
Recorded date for the vessel’s loss or disposal.
29/03/1911
Name of ship as recorded on the record
Dunmail
The process of transferring a vessel to water, but not necessarily her completion.
15/12/1883
Unique identifier for a given ship, it is assigned by a builder.
145
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Machinery
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
10/09/1883
The individual and/or organisation listed
Sharp & Co
Name of the individual/entity/organisation responsible for authoring the record
James Bain
Name of surveyor.
James Bain
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
999
Location of construction for a vessel’s engines.
Stockton
Blair & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
Three quarters of a mile north of North Cheek
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.