Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/1897
The year in which a vessel’s construction is completed.
1897
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Rijkee & Co
The country in which the vessel’s construction took place, at the time of writing.
The Netherlands
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Rotterdam 2291
A vessel’s means of propulsion.
Steam
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Halaban
The process of transferring a vessel to water, but not necessarily her completion.
10/07/1897
The port or place in which the vessel’s construction took place, at the time of writing.
Rotterdam
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Sketch
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.